Lounge area: I need 2 wall plugs installed. Then a plug for aircon. Then the gyser is not working it keeps tripping. The only thing that was not replaced is the switch for the main DB board.
Still needing quotes as I need know how much I must spend, I need panels that can cater for 5 roomed house plus 2 outside rooms and a garage.
To get off grid with eskom. Paying to much money to eskom. Use for lights, fridge and freezer, kettle and/ or geyser.
I'm khehla from Duduza Nigel
I want to go off grid.
Need solar panels for household use especially lighting, electricity not yet installed
Installation quotation for small scale workers house in Harrismith area. It will be 3 systems in total with the following 5kW inverter 5kw battery 4 x W panels. We wil supply every thing except PV cable 4mm Red and Black = 10m AC cable 4mm Flat twin = 5m Wire ways Earthing Labour Transport from Harrysmith to farm +- 40km
4-bedroom home with separate Entrance flatlet. Description Rewire 16 x plug points Rewire lighting points and fit new light switches Install new geyser isolator Install new stove isolator Install new 4mm cable from isolator to stove Rewire and reconnect main DB Compliance certificate Relabel main distribution board Bond and earth hit water silinder
I want to install a solar system at my grandmothers house which is occupied by 3 adults and 1 child. The house has backrooms which have no stoves.The houses has 1 L geysers and an electric stove. In that area there has been no power for the past 4months due to a transformer that was overloaded and it broke down.