Existing asbestos roofing needs cleaning, some sealing and painting. Exterior walls, barge boards and facia boards need painting. Wooden doors and windows need varnishing, all window putty to be replaced. Property has two buildings i.e. main house + outbuilding. Work to be done on both structures. Boundary walls also require painting.
1.) Remove existing section of Aluminium Extruded gutter. (~3m) 2.) Remove existing rotten barge board/facia board (~ 40mm x mm x 3m) 3.) Replace (2 above) with new piece of barge board/facia board (~40mm x mm x 3m) 4.) Treat with Creosote 5.) Replace Aluminium Extruded gutter (~3m, removed in 1) with proper slope. End of job scope
We have a unique water saving product which needs to interface with the hot water pipe going to the mixer of a shower. The products consists of two boxes, one housing a flow switch and a solenoid valve. Work to be done: If the hot water pipe is accessible from the top in the roof then the two pipe attachments of the flow control need to be interfaced with the pipe. If the hot water pipe is not accessible then the tiles need to be removed from the shower wall to get access to the hot water pipe and a small box housing the flow control equipment needs to be fitted to the shower wall. The cable which is used to measure flow and control the solenoid valve needs to be placed between the tiles and fitted to the electronic control which is linked to the AC supply.
Recently my EL on the main DB has been tripping. There is a grid typed inverter(installed 6-8 years ago) with neutral and earth internally bonded before this EL, that has it's own DB board with it's own EL downstream of the inverter. Problem varies in frequency but becoming more frequent. Main DB and EL runs the house. Stove. Geyser. Rooms etc.
Good day, We are the managing Agent group for a property in Wellington, SA. There are Three Units on this yard. Two of the Units have reported maintenance issues. Can you please assist with quotes on the following issues. Quotes needed from 3 x Contractors/Handyman's please. - Unit 1 - separate Quotes for each issue in this Unit. Quote 1.1: Bedroom Light - Light will not turn on. Bedroom Floor/Tiles - Cracked floorboard as well as several soft spots in the floor. Quote 2.1: Bathroom Tap - Once tap is opened it will not shut off. Quote 3.1: Outside Drains - Drain not working. Will not drain as it is higher than the gutter. Filter is not in and cannot be put in. Quote 4.1: Outside Roof - The fascia is rotten under the gutters. Gutters is also broken. - Unit 2 - separate Quotes for each issue in this Unit Quote 1.2 BATRHROOM: Storage cupboard - Door came off and hinges damaged Bathroom door handle - Broken Quote 2.2 ELECTRICITY: The electricity trips each time I put the geyser on - but only if the kettle or microwave was in use. If the kettle or microwave/airfryer is not in use, the electricity does not trip when the geyser is put on.
Recently had a Mercer inverter installed. Can't understand why green light stops and goes on all the time. This is the 2nd set of batteries he got for me. He doesn't get back to me. I am on pension and have been badly let down and taken advantage of. I cannot afford to pay a large sum of money for a call out. I just need advice please. Deeply disappointed and depressed about the matter. This is not what i bargained for. Thank you.
An electrical installation is a group of items of electrical equipment that are permanently electrically connected together and can be supplied with electricity from the works of an electricity entity or from a generating source. An item of electrical equipment may be part of more than 1 electrical installation. Steps to Install electrical distribution board You must have to install the feeder pipe at first. If you're using metal pipe, place a plastic bushing over the connector threads. Using a tape, pull the electrical feeder wires through the feeder pipe. Leave enough wire to get to the opposite side of the panel.
5.1 Daily service Sweeping all parking areas using hard brooms and blowers Cleaning of all yard surfaces using blowers and/ or hard brooms, emptying all ashtrays in the smoking areas, daily All entrances, pathways, and parking areas to be always kept clear of leaf litter and soil wash (includes parking area). All rubbish/litter (incl. bottles, plastics, papers, cans, cigarette ends, animal litter etc.) will be collected daily by the garden technicians. 5.2 weekly services De-weeding: all paved areas and gardens, including underneath trees and shrubs, shall be kept weed free. Care must be taken not to disturb healthy micro elements in the soil. Cleaning of carports roof to avoid rust causing by leaves falling on top of it. Leaf litter, general litter, and garden waste removal: The contractor shall be responsible for the removal of the day-to-day garden refuse accumulated during the maintenance process. 5.3 monthly services Cleaning of all water channels, trenches manhole grids, gullies to ensure water flows freely during rainy days. Get rid of all trees, grass along the fence inside and outside of the premises. Ensure that outside the fence, there is no trees hanging over the fence and grass must be cut about one mitre away from the fence. Minimal formative pruning will be performed by the contractor as part of general garden maintenance during the growing season on all trees and shrubs.
Good day I am looking for quotes for an electrician to wire a new house with the following scope of work: - Issue COC once job is complete - Connect power from mains to the DB - Wire the DB - Secure all wiring in conduit - The following will need wiring: - About 25 plug points - 1 stove isolator - About 20 lights and light switches Thank you Regards
Good day I am looking for quotes for plumbing services for a new house. The scope of work is as follows: - Issue plumbing COC - 2 geysers - Connect house to main sewer - Connect water from meter to house - Plumbing and toilet installation for 5 bathrooms - Plumbing to kitchen sinks - Plumbing to 2 outdoor taps Material will be supplied. Regards