We have a holiday home that has been vacant for a period of time and requires a moderate spring clean including the following: Vacuuming and mopping of carpets, wooden, and laminated floors; Vacuuming of curtains; Wiping of surfaces and shaking out several mats/carpets; Cleaning of three bathrooms; and Washing of several windows and window frames. As from 13 December or as soon as possible.
I will need a brick wall (no plastering) to be built in the front/entrance to the property. I would like quote for both a 6 foot and an 8 foot to compare please. The length of the front is 28.m. I would also need a solid motorized gate (extending as far down to the ground as possible) also to be put up with the erection of the wall. The start of the project would only be late January, early February next year.
We have a unit that originally had a balcony (1.2m x 4.0m), that the previous owner closed up with hardwood floors. We want to return it into a balcony: remove the windows, return the balcony floor to the original concrete, and install a sliding door again. We already had the wooden floorboards removed, but we need a quote on: - Removal of screed (where the floorboards used to be) - Finishing of the drop / sliding door cill, from the inside of the apartment to the balcony floor (where the sliding door frame will be installed) - Finishing of the balcony floor (smooth concrete, as it was before, is OK) to make sure that any rain will flow to the original draining pipe. - Cleaning of screed/rubble. Please see the attachments. We need measurements and briefing with the sliding door installation company to happen tomorrow (Wed 13 Dec). But we are flexible with the job start time (either this week before Friday or in middle January) For now, we only want a quote on the screed removal / return to concrete flooring / preparation for the sliding door frame. Depending on the quality of the job, we will consider you for the removal of the windows and finishing of the exterior wall (once the sliding door is installed).
I am guessing the roof area at +- M2? This is a 2 bedroomed house with a 4 -triangled roof facing 4 ways. One section receiving direct rain needs extra attention and the rest still reasonable. You will probably check all measurements on internet Google maps etc. Quote to paint roof in green please. This must wait untill mid to end January'24
i need the bathrooms X 2 renovated, fitted with a new cabinets, toilet set and the ceiling to be fixed and the floors and wall tiling thereof. there is also an outside toilet which needs to be fitted with a new set. The ceiling for the whole house needs to be redone, 2 bedrooms, living room , dining room and the kitchen. The 3 bedrooms to be tilled. thanks
Remove existing toilet, pedestal basin and taps, medicine cabinet, 2xtowel rails, hand towel holder, toilet paper holder and toothbrush holder. Replace above. The pedestal basin is replaced with a cabinet basin. I am out of town from December 23 through 30, so any time before or after that would be great.
This is a very old property and it’s one of those old Hutton properties where everything needs to get sorted out from the electrical stuff I mean the electrics in the house is just appalling it needs a solar rooftop thing, there’s air locks in in the system so there’s often times where we don’t get water. There’s a lot that needs to be done
The site is a triangle. A small front equals to a car gate area. I have a plan draft which depicts a small double storey house with a basement. My plan has one large en suite bedroom, small kitchen a lounge, 2 bathrooms and a dressing room on the upper floor. An entrance hall and staircase on the ground floor. A basement underground. The roof is concrete and has skylights which are protected by burglar guards. The whole house will built of concrete like a bridge. Three small windows only; 2 x for bathrooms and 2 at a passage. Skylights and a number if top and bottom ventilators. Security against looting and buglar is emphasised on plan. Dust also is considered. Only one door. Top door leading to the roof.
When there is a rain everytime my house is flooded with rain water coming from the shower drain trap, bathroom drain trap . What is worse is the sewer and storm water drain pipes they release in the yard. It looks like there is a blockage in house pipes. Can you kindly send me a quote please see how i get affected.
Plot size: sqm. Log house, pine ceilings, 3 bedrooms, 2 bathrooms, lounge, modern kitchen with modern furnishes, tv room, entertainment area with indoor fireplace, tiled floors, build in cupboards in bedrooms (walkin cupboard in main bedroom) , kitchen, laundry room, 2 x garages with rollup doors and carport, tiled paving, storage outbuilding, modern tinted windows, strong wooden doors.