We require a new manual change over switch installed at/near the db board. New external water proof plug point installed on the outside wall for the standby generator. Replacement of 1 x day/night sensor operating 2 x LED exterior lights. Replace 1 x "jam jar" light fitting. Remove "illegal" cable installtion to exterior plug point and run new T&E cable from exterior plug point to DB board, through newly installed conduit housed in wall.
Supply and install DB (surface) with earth leakage, ATS, and double pole circuit breaker (10A). ESKOM supply circuit has 3 phases, with phases separated in the house. backup power supply to be done from 2 alternative points: 1. existing diesel generator (RG-I) 2. future inverter/battery/solar system
EMAIL ONLY Work to be carried out for Compliance Certificate: Kitchen Replace 3 lever switch - cracked modules Living room Replace plug behind TV - Stuck shutters Garage Rewire garage motor plug. Currently on twin flex. 6m and install 4x4 wondabox and plug. Upstairs living room Replace fused 12v globe Replace plug at wall near steps Stuck shutters Upstairs bathroom Install 5amp isolator for extractor. Fan not running not part of compliance. Check for power. Ensuite Install x3 stream proof fittings down lights Room off ensuite Replace plug under counter and check earth connection Balcony Replace 4x2 plug - rusty. Outside back Replace 4x2 rusted plug in s15 box Roof space Install push gland at round box Install x3 isolators for geysers Install 4x4 surface mount wonda box at flush box and separate cable entries x2 Close connection at corner of roof space Upstairs roof space Install 2x4 surface wondabox in place of flush box and cover. Replace 4x4 flush box with surface mount box and separate cable entries. Bar area. Area tripping faulty transformers. Replace all with v led warm white lights X10. Outside front Install isolator for gate motor Main DB Downgrade 40amp above to 30amp Install blanks to open spaces Label joinery
• the storeroom light works but only at night as its linked to all the other communal lights in the building that only switch on at night ( all linked to a timer which is linked to the main DB , next to the storeroom). So, the storeroom light stays on all night which is a waste. As do all the garage lights as well. • We need to separate the Storeroom light switch from the timer so it can be a standalone switch. • the communal area is the one that needs to go on a daylight switch
Need to connect a 3 wire Franklin Electric borehole pump to a modern switching gear also from Franklin Electric - The insurance guy disconnected the pump from the old box and said the box was faulty, thus got another better box. Thus no indication which wires are connecting where, thus testing of motor to be done. Box is already fixed to the wall and only need the connection to the pump and providing of a CoC for insurance purposes/
LEVER, MANUAL CONTROL: TYPE: HANDLE SHAFT; DIMENSIONS: WD X LG MM; MATERIAL: PLASTIC; SHAPE: T BAR; FEATURES: HANDLE; OEM P/N: 8UD-3AF21, OEM: SIEMENS PROPRIETARY LIMITED; DOOR COUPLING ROTARY OPERATING MECHANISIM STANDARD WITH TOLERANCE COMPENSATION SIZE X MM; SHAFT 10 X 10 X MM; TEST 0-1; COMPLETE UNIT HANDLE MM ACCESSORY FOR 3KD SIZE 4; 3KF SIZE 4; COMPLETE UNIT HANDLE MM ACCESSORY FOR 3KD SIZE 4; 3KF SIZE 4; DESIGN OF THE PRODUCT STANDARD WITH TOLERANCE COMPENSATION; DESIGN OF HANDLE: GRAY; DESIGN OF THE DOOR LOCK SYSTEM: DOOR INTERLOCKING; SIZE OF CROSS SECTION OF THE SHAFT OF DOOR COUPLING ROTARY OPERATING MECHANISM 10X10 MM; SHAFT: 8 X8 MM; LENGTH OF HANDLE: MM; LENGTH OF SHAFT OF DOOR COUPLING ROTARY OPERATING MECHANISM: MM; PROTECTION CLASS: IP 65; VENDORS ARE RESPONSIBLE FOR ENSURING THAT THEY ARE PERFORMING AGAINST THE CORRECT DRAWING REVISION NUMBER (IF APPLICABLE). I WANT 14 OF
Hi there! Electricians SA Page: Electricians in Lyttelton Manor My name is: I require assistance with: To install a standard size Bosch electric oven, hobb and extractor fan and a plug for the extractor fan only. We would also like to receive a COC for the installation of these appliances. What will you qoute us?
*Distribution bord upgrades, rewiring and repairs x 1,00 *Earth leakage and power tripping problems x1,00 *Repair and replace electrical faults x 1,00 * failure and outages x 1,00 *Lighting and design and maintenance x 1,00 *Repair and replace isolators x 1,00 *Repair and replace plugs-normal and red plugs x 1,00 *Stove fitments and repairs x 1,00 *Surge arresters and earthing repairs x 1,00 *Wiring (per meter) x 1,00 *Repair and replace switches and main switches x1,00 *Repair and replace electrical faults x 1,00 *Light fittings x 1,00 *Call out fee rate x 1,00 *Call out fee after hour x 1,00
I am electrician I do have my own company I will like to register coc certificate for my client. I can do so many jobs and are being have the problem of an issue of certificate of compliance. Please if you may give me the chance and also the opportunity to issue the coc certificate because of I make qualify electricity and also I can do good things for my clients and all the community people
Please provide me with a quote for the following: APPLIANCE REPAIRS – 7TH FLOOR GAS STOVES 1. Major services of gas stoves 2 2. Replace switch nob 1 RETIGO OVENS 3. Replace flexible pipe 1 4. Replace water solonade (steamer valve) 1 DEEP FRYERS 5. Replace thermos switch 1 6. Major Service 4 7. Replace cut off switch 1 DISHWASHER 8. Major Servicing 1 9. Re-programming rinsing settings 1