We are moving into a rented house, which we may decide to buy and renovate later. Initially we would like a quote for doing some restoration/repair work and a thorough repainting of the main downstairs rooms as well as the 3 bedrooms upstairs - we will have occupancy from 1st of Feb but will be allowed access before that to complete the work. If the work is good quality, you would be considered for the larger renovation once the property is purchased. Thanks,
1) To remove the retainer blocks in question against the precast fence between units 2 and 3. 2) To excavate and pour a 25 MPA concrete foundation. 3) To construct a new 1, high wall as close as possible to the precast wall – face bricks to match the existing walls and common bricks to be used behind the face bricks. 4) To remove the existing paver blocks at the proposed new position of the spa - bath - to lay the above blocks elsewhere as required by the owner. 5) To lay a level mm thick 25mpa concrete slab on top of BRC mesch – size of slab to accommodate the spa-bath. The edges of the slab are not to protrude more than mm from the edges of the spa – bath.
Retaining wall to be built along length of the house and as a support structure for sinking swimming pool . Foundation to be pinned. Large tree to be removed with root system to be killed off. Septic tank and sewage system to be replaced. Water and geyser system to be replaced/upgraded to improve water pressure and flow. Floor tiles to be removed so that foundation can be repaired. Tiles to be replaced. Major structural cracks on walls to be repaired.
*Renovating an open plan kitchen to be more functional, better functional design and more clever storage solutions. *breaking through to incorporate two back to back bathrooms into one larger, more spacious main bathroom en suite with walk in wardrobe. This is for my mum, I am doing this project on behalf of her, I require quotes to compare and make an informed decision on which avenue to go with.
Plans were submitted and approved. An engineer has been appointed. Want to remodel (break down 2 walls and refurbish existing bathroom) sub economic house and add an upper level consisting of a bathroom, 2 bedrooms and a pyjama lounge. The plan is to use nutec/timber on the upper level and a conservatory on the ground floor level. Please see attached plan.
Repair - maintenance. Roof room was built 30 years ago by Adrian Greylling and is generally in very good condition . We have been very happy with room. However the outer layer of the sheets of wooden material used for the walls, is crumbling in small sections - facing into the weather Would like to assess repair before Cape winter
Additional 3 bedroom on the double garage side. Double garage is 6× 6.5m extend for bedroom of 3.6×3.6 & bathroom with wardrobe of 4.5×2.2. On the floor will be a main en-suite plus open kitchen living room area plus a guest toilet 2×3m. Then upstairs will be a 2 bedroom each 4×5m Sharing a full bathroom of 3×3.5 and extra toilet of 2×3 & the extra 2×3m space will be for entrance upstairs.
This is a commercial building that needs to be gutted and demolished completely on the inside and new furnishes need to be done including flooring on the whole of the inside and outside areas. This project has a strict timeline and I am requesting that I am able to get access to the building from the 1st of April and I am expecting hand-over by the end of April. Building is approx. sqm in size. I am also going to need the builder to be able to share their contacts to help with the finishes like windows, doors, etc.
I recently had a water break in a wall at my house which since been repaired. however the hole and resultant damage has not. What I need is a builder to repair and plaster the hole, someone to paint the wall and someone to repair and replace a water damaged cupboards and tiles. The hole is small and needs about 10-12 bricks on one side and a patch of about mmxmm on the other (it's a cavity wall). The cupboards are 3x double floor cupboards in Wenge wrap but all 6 doors are not damages, so it's just the carcass that needs replacing. The tiles are about 5-6m of vertical tiles mounted against the foot of the cupboard and possibly 20 or more square meters of floor tiles. the paint could also be around 10 square meters.
Need to close up 2 balconies, 1 large, 1 small, extend the small one to add en suite bathroom. Extend large patio and close up with stacking doors. Also close up small patio. Add bay window above front door (existing slab). I am still in the planning stage and trying to get quotes so please email or Whatsapp. Plans have only just been submitted to Council so it will be a while before final approval.