3 bedroom house All the bedrooms must have a bathroom but the 2 bedrooms it must only be a shower,toilet and basin then the main bedroom's bathroom must have a shower, bathtub, basin and a toilet then The lounge A seating room And a spare toilet,basin and bathtub And a kitchen Double garage
I am in need for someone to supply and install 2 external wooden doors. They must be experienced in this. one door opens outward and will need a strip down the length of the door that covers the opening to prevent the door from being forced open from the outside. Door frame size is cm x 81cm Other door opens inward to the loft room and is shorter than standard. frame size cm x 81cm Both doors have good hinges but need decent handles and secure outdoor locks. Good quality wooden external door but not decorative
*Renovating an open plan kitchen to be more functional, better functional design and more clever storage solutions. *breaking through to incorporate two back to back bathrooms into one larger, more spacious main bathroom en suite with walk in wardrobe. This is for my mum, I am doing this project on behalf of her, I require quotes to compare and make an informed decision on which avenue to go with.
We need proposals to install a Solar power generation plant: • 20 Mva. to run the whole mine • 6 Mva. to run the certain sections during load curtailment only This will cover. • Main plant • Circuit D • TSF • Vertical shaft • Underground • Compressors • Surface infrastructure Scope. • Design • Supply • Install • Maintain Please include options like below • Hire to own. • Outright purchase • Power supply only, pay for power used, (no CAPEX) • Rental • SLA on all options
I trust you are well. Please could you quote me on the following. I would like to minimize cost as much as possible. Solar hybrid inverter. Would assume 5kva Solar panels. Would assume 6 panels Lithium batteries. Would assume 2 batteries Installation. I'm looking to be able to have Solar power available throughout the night and recharge and run during the day. I would like to be able to at least utilize a airconditioner and an airfryer as well for a short duration. I would probably need to look at a separate Solar geyser. This is for one person in a simplex. The issue is that sometimes power can be out for over 12 hours at a time and out for extended periods of time as well, so really just need to be covered for these periods.
Plans were submitted and approved. An engineer has been appointed. Want to remodel (break down 2 walls and refurbish existing bathroom) sub economic house and add an upper level consisting of a bathroom, 2 bedrooms and a pyjama lounge. The plan is to use nutec/timber on the upper level and a conservatory on the ground floor level. Please see attached plan.
I want a quote for at 5kw solar system, I need to power a double door fridge/freezer, 2 PC's, one vinyl cutter, 2 3D printers, a few lights and at times one or two household appliances, I need to use the TV and TV box at night, these will not all be used at the same time, I want to be as independent from the pathetic Eskom grid as possible, I have a generator but its not feasible to run currently as fuel is too expensive, the deal will be cash
Need a double door opening to outside. Currently there is a wood and glass door and frame in the position, would like it replaces with aluminium and glass doors and frame. Measurement from where concrete wall meets wooden frame is cm high cm wide. See attached photo. I prefer being contacted via email or Whatsapp
We have plans for a multi phase product with various building works needed. Phase 1 - Conversion of double garage into a small flatlet (marked gymnasium on the drawing attached) the drawing only indicates requirements to pass the plans, but we would need all the additionals such as kitchen cupboards, BIC in bedroom and plumbing done (we have our own electrician) Phase 2 - Conversion of outbuilding into small bachelor pad (marked storeroom conversion on the drawings). here it would be the same as per the Garage conversion with less tilework but all the Sanware and plumbing included. The plans for this section will likely change a bit, but the general idea is indicated on the drawings. Phase 3 - Newly Built staff quarters. This will be a complete build from foundation to roofing. Due to the slant of the property the unit will likely be build on a platform or dug out to level the ground for building works. Phase 4 - Yard work. there is a tar driveway that needs to be extended into the property with parking bays. there is also 2 precast concrete walls to put up (10m and 18m approximately) as well as an existing parking bay needing renovation. Please could you be so kind as to provide estimates and quotes divided into the phases of the project so we can make decisions on the order of the phases based on cashflow and budgets.
Repair - maintenance. Roof room was built 30 years ago by Adrian Greylling and is generally in very good condition . We have been very happy with room. However the outer layer of the sheets of wooden material used for the walls, is crumbling in small sections - facing into the weather Would like to assess repair before Cape winter