It is a 1 and a half bedroom flat. I would like an evaluation done on the wiring in the kitchen specifically. A certain plug trips the Earth Leakage constantly and I'm concerned that the wiring might not be safe anymore. Also the ceiling light in the kitchen has stopped working. Replacing the bulb with a new one did not fix the issue.
Looking for a certified electrical contractor for a new construction project. From initial City Power application to final sign off. (Labour only) Project is 18 Units. 9ground floor units and 9 first floor units in one block. 2 bedrooms/Unit. Units about 42 sqm Rough estimate per unit is as follows * 10 plug points * 7 light sockets * 5 light switches * 1 DB board * 1 Stove switch Perimeter lighting points and access gate electrification
want to know how much a new db will cost me with 2 x20amp circuit breaker and 1x10 amp circuit breakers ,40 A man circuitbreaker and one earth leakage ,to new led lights in bathroom amd bedroom . and one lightswitch for bathroom with its extetion box as it is old steel ones ,,how mich will it cost to supply and rewire db again .its only this beacuse its a outside builder at the back of my house
Garage installation 1. Small DB(E/L plus two c/b 20A and 10A) 2. 20mm pvc conduit (3) 3. 20mm 90 degree bends (5) 4. 20mm hospital saddles (10) 5. 20mm male adaptors (6) 6. 20mm couplers (3) 7. 20mm 3way junction box (3) 8. 1.5 led double fitting (1) 9. 4X4 surface mount box (2) 10. 4X4 single plug (2) 11. 4X2 surface mount box (2) 12. 4X2 two-way switch (1) 13. 4X2 double switch, one-way and two-way (1) 14. 20watt led flood light (2) Please quote me on the above-mentioned items supply plus installation Please call me for more info.
I would like to get a quote for removing the old roof and then installing the new one. I would prefer to be tiles this time around. Please state the cost for labour plus the cost of material then I will decide whether to buy the material myself or what. Please send me the quote via Whatsapp. Thank you
Hi There, We are renovating and adding an extension to our residential property. The extension is estimated to be about 50m2. The build also includes a slab over the entrance. We are looking for a quote for the roofing, labour and materials included. Please see the document attached for further detail. Please send me an email at I'm in meetings most of the day and would also like to keep a record of communications through email. Thanks for the help!
My geyser switch keeps tripping on the DB board. We live in a complex so I contacted the body corporate that sent an electrician and said the thermostat was faulty. The electrician replaced the thermostat but the problem still persists. Not sure what else the issue could be. Please advise how much it would cost to repair?
Problem : Mazista Natural Slate Roof replacement (or fully refurbish with new underlayer). My slate roof is in need of full underlay refurb / replacement by specialist slater, or full replacement alternatives eg . metal, shingle etc. It is steeply pitched double storey at 51 deg with multiple large dormers ( x7 ). Total sloped (ie. slated) roof surface is sqm. The fibre-cement gutters can support ladders. Cost of full underlay refurb versus new outer material covering will be key, however migration to a much lighter roofing material like steel (1/5 est) is a strong factor since de-trussing inner sections will allow creation of wanted loft space, so may override cost concerns. Currently replacement thinking is new Standing Seam metal zincalume type covering (if possible due to complexity of dormer valleys), but also metal shingle look alike products, or simply Everite fibre-cement mitred slates. Bearing in mind that the current trusses will be more than capable of supporting any other roofing material without much modification. P.S. See attachment pictures to give a better idea of the dormers and valleys.
I have a 2 Bedroom Townhouse in Gonubie it has18 plug points. There is a -litre Geyser, 4 plate stove/oven. Would like to have this done in stages, plug points first, then Geyser, lastly Stove. I need a professional that knows how to install a solar panel that will accommodate all of the above-mentioned points. Please feel to contact me for more info.
Senior Phase LED Lights: 39 maintenance; 8 new installations 6 Bulbs removal and replacement 13 Disco-light bulbs replacement 1 Floodlight installation 2 Garden pole lamps replacement Foundation Phase LED Lights: 13 replacement; 2 new installation 3 Floodlights installation 1 New plug point 2 repositioning of existing lights I also need a COC