Good day, I would like to get a quote to install a 16Lpm gas geyser. I need a price for the geyser, as well as the following materials: cowl, pipe, inline strainer, batteries, gas pipe, regulator, gate valve, 15mm copper weld on elbows, 15mm weld on male and female adaptors, 15mm cobra safe pipe, 15mm conex t-stuk, 15mm conex elbows. Then labour and travelling (the travelling for as if I am staying in Potchefstroom please?) I already got a local quote, I just want to compare the quote.
To strip, remove and discard all the existing perished torched on waterproofing mats on the main roof where the current washing lines are situated at being; SQUARE To strip, remove and discard all the existing perished torched on waterproofing mats in front of the domestic quarters which is situated on the adjacent side of the main roof being; 91 Square additional balconies in the front of the building and another small concrete roof on the lower level.
St Albans College. Library roof needs urgent waterproofing and repair. Screed concrete slab towards outlets , where necessary * Waterproof ±m² concrete slab * Supply and replace broken roof tiles * Waterproof ±m wall flashings * Screed ±m box gutters towards outlet to rectify pitch of water flow * Waterproof m box gutters * Paint UV resistant
Hello! Area above two bathrooms allows water to enter next to the wall. Flat roof with gutters on it. Main roof were fix 3+ years ago but this 5m stretch starting to create problems. <10 m2 urgently; maybe need update bigger area as well. Don't think this job is very big as a start and will take max a few hours. Thanks!
Remove plastic roof sheets Replace with sink roof sheets either 3m or 3.6 m in length I will buy the material and that will include the sink sheets as well as: 2 x 5 Ltr Cemiflex, 2 x Rolss of mm x 10m membrane, 1 Bag of Portland cement, I therefore require a quote for labour to do this job Thanks
se are two small side roofs that were built as part of a big project two years ago. On he side a skylight was added last year and even after numerous attempts to seal it the contractor has failed to sop the leaks. Depending on the wind direction and the volume of water the other side still leaks occasionally also. That side now has a deck over it now, which will need to be lifted. We would like both roofst to be rubberized.
Knowledgeable person to come and do site inspection. New extension (36 m) from existing electric fence is required to be installed on top of newly installed palisade fence, with gate on street front. Connection is to be from existing energizer. Repair one or two broken earthing pegs. Assess the general condition of existing segments of electric fence. Provide a quote that specifies cost items and labour. It would be greatly appreciated.
Five room with double garage and bathroom kitchen with two separate single plung and sitting room with two separate single plung the other three rooms each with single plung ten outside lights one plung in garage and bathroom and isolator for stove eah room with single switch and two passage switch and light in veranda
IRB waterproofing quote needed. Greetings to whom it may concern, I have a house with part of the roof being flat. The problem initially was the gutter connectors are to small for a large amount of water. Subsequently outlet avenues were made available as to alleviate the water buildup. I have had work done on the roof and recently had an assessor from outsurence asses the roof His recommendation is that a thorough waterproofing needs to be done as the waterproofing done last year is flaking and allowing some water to seep through. This needs to be sorted out and would request an assessment and quote in this regards.
I need electrician to install a backup power system on a house. All components: batteries, inverters, wires, connectors ect will be supplied. The batteries and inverters will be installed in the garage of the house, power will run from the main db board to the inverter to charge the batteries, then back out from the batteries to the inverter to the db board into the house. When power to the house from the municipal main line cuts out the power from the batteries will kick in and power the house. Expectations: clean and maintainable job needs to be done, the work will be inspected afterward and any necessary changes will have to be made, safe and maintainable work is of priority.