Victron 10kVa - 2 multi’s in parallel coupled to 4x Ah BSL battery bank. Cerbo GX, lynx distribution . This system is currently my backup system. Time to do expansion. Looking to install 6x W on north and 6x W east . Two strings + earth 50m per string connected to a PV combiner and a RS mppt . 3m ve.direct for coms to cerbo Specifically need pricing on delivering and lifting panels onto a double story roof and to pull two strings plus earth. That’s all . Everything is already done as I am an authorised installer for Victron energy but do not have the man power or team to lift mount PV and pull strings . Live in the JHB north area.
I'm wanting to purchase a solar panel, an inverter battery system to power an internet connection and one or two household plugs for Television, charging computer/cell phone etc. I have a budget of R50 I would like the system to be able to be upgraded and expanded on (add batteries, add panels etc.)
Hi, could you perhaps advise if you are able to assist with installing/upgrading a solar/hybrid system? It is a residential house at , 22nd Avenue, Villieria, Pretoria. 8kw inverter, 5 or 10KwH lithium battery, connected with existing panels and also additional panels to be mounted on a carport roof.
We have a very old 3 bedroom house that has not been lived in for 40 years. It's a square meter house. The house's electricity runs off a super old diesel generator. We basically want the entire house's electrical to be redone and then put it onto solar power and off grid. Send me a WhatsApp and I can send photos and videos.
We have sold our property at Louisvale dorp. We have a valid COC, but afterwards, the buyer saw things he does not feel comfortable, request a new COC. We need urgently someone to go and have a look at all things on the current COC, and release a new one. It's very urgent and I will appreciate feedback as soon as possible, thank you.
We want to extend an existing 3 phase connection with about 15 meters (and drill through 3 walls). We need to connect 3 normal ovens and stove top units (probably about 8kw) + 1 deck oven ( like this: https://www.absolutecateringequipment.co.za/product/single-deck-oven/) to this three-phase connection (in a separate circuit box). If we can add a meter to measure what is being used in this three-phase extension (in that circuit box), this would be good. We also need to know if this extension might require a higher amps circuit breaker on the existing connection.
Need pricing on a full house rewiring. Square meters is m² x two floors. Double storey house that has been vandalized. Need pricing on the following items: Single plug point Double plug point Light point Downlight point Wiring per square meter DB point Aircon point Geyser point Stove point Outside plug point Gate motor point Outside light point Outside wiring per square meter
I would Like a quote to supply and install a 3 KW inverter with Battery Back Up, Lithium-ion or battery bank capable of supplying power for 4 Hrs, the equipment I have is a fridge microwave two desktop computers a server box and Printer I have had countless hours of additional power outages beyond Eskom Load shedding. the inverter would be Mounted next to the DB as well as the Battery Bank would also require a COC for the Works regards
install 9 double plug points chasing has been done, we will supply plugs, install 4 light switch points, most wiring is done new outdoor double plug we will supply 3 ceiling fans with remote control in existing lights 2 new single plugs in kitchen for extractor fan and ignition on gas oven, chasing done, we will supply plugs new junction box in bedroom ceiling some extras this job is very urgent as we were let down
We need advice on what needs to be done to obtain a COC. It is a farm / rural/ setting. We then need a COC to be issued when compliant as well, We were also advised to rather remove unnecessary items like pumps for water fountains, "pretty stoep lights" and self installed leads etc. The are three Eskom low amp boxes on the property that feeds each building