. The Boundary Wall at said Unit was Accidentally Bumped by a Vehicle and the wall was damaged to such an extent that it crack through on both sides for +- 15.6m2 and dislodged from the pillars. The wall will need to be broken down and Rebuild form the foundation. (See attached Photos) Wall Will Need to be Waterproofed / Prepared for painting and then re painted.
. The Boundary Wall at said Unit was Accidentally Bumped by a Vehicle and the wall was damaged to such an extent that it crack through on both sides for +- 15.6m2 and dislodged from the pillars. The wall will need to be broken down and Rebuild form the foundation. (See attached Photos) Wall Will Need to be Waterproofed / Prepared for painting and then re painted.
Approx. size of the extension/remodel (sqm) Ground floor: Approximately m^2 First floor: Approximately m^2 It is rough estimation, will clarify with draftsman . Contact me via email for now. Do not call above number. Surburb (Area) : Mahube Valley, Mamelodi East Documents will be uploaded once finalize with draftsman
Full turn key project, renovate two bathrooms, demolish, brick up re-plaster, paint and finishes, interior lay-out, remodel/ paint existing furniture, aluminum and glass partitioning, blinds, curtains, lighting, switches, re-wrap cupboards & spray paint- over all remodel from dated to industrial design in brick, glass, steel, aluminum look and feel (man cave style)
I am wanting to turn a 3 Bedroom & 1 Bathroom home to a 5 bedroom with 3 Bathrooms (2 En-Suite) and also add a 2 car garage in the premises, I want to open up the kitchen by removing the wall diving the lounge & creating an open plan furthermore extend the lounge/kitchen side and extend all 3 existing bedrooms
I'm converting my garage into an extra bathroom and bedroom. I need the garage opening bricked up with a x window built in. Also require demolition of part of the firewall in order to connect garage to main house. A few other electrical and plumbing requirements within the house Garage is phase 1. Phase2 and 3 will follow after plans approval
1. Boundary wall 24m long x 2m high. 2. Wall to be plastered and painted. 3. Motor gate. (Motor is already available). 4. Pedestrian gate. 5. Pavement in front of the gate. 6. Motor gate must be positioned 2m away from the left corner. 7. Remove concrete outside and replace with grass lawn. 8. Remove the plants outside and replace with grass lawn. 9. Repair the pavement next to the tar road. 10. Further details are on the attachment for clarity.
Hi there, I am looking to get the interior of a new cottage painted. The cottage is around sqm. It has two bedrooms, a lounge, a passage, and a kitchen come dining room. I am looking to paint the walls and ceilings. I am also looking to paint the exterior of the house, which is a much smaller area. As well as the outside walls.
Yes I live with my parents,since late granpa build our three rooms (mud) it's totally finished everything. The entire house can fall to us anytime. Please kindly assist. Even our front wall fell next to our neighbor. I can't do anything cz I'm a bread winner everything I get to put food on the table.and I'm not lying anyone can come and visits for view . Please I've been looking for this opportunity to get help 🙏
It's in phases. First phase 1. Faster board replacement 2. Gutter replacement where needed 3.beams to be replaced around the house 4. Removal of old outdoor shower 5. Window replacement 6. Painting the outside of the house and retainer walls. 7. Enclosing entertainment area but no plans submitted yet .