Project in early stages of planning. NPO being registered still. Existing structure in Bokkie park will be extended out towards the dam. same dimesions as existing structure. 21m long by 6m wide. We will enclose existing structure and build kitchen and bar. Extension will be enclosed carport basically with big sliding door openings facing dam. This will be for seating. On the far end next to bathroom a office and additional bathroom will be constructed. All bricks for walls and IBR sheeting for roof. Existing roof does need some patching.
Toilet is not flushing properly. It only flushes when I open the clean out pipe and let the air out. The last few days even that is not helping to make it flush and the drain fills up. Solids take forever to flush down. Water level in toilet drops and it makes a glugging sound that goes on until I open the clean out pipe.
Hallo. Ek wil graag idees he hoe om my seun se woonstel atmosfeer te gee. Hy het in n woonstel ingetrek sien fotos aangeheg. Kussings, iets teen mure, bedlampies, kuns plante, lamp, ornament en dalk n mat. Kleurskema by fotos. Hy wil nog n tv cabinet kry om die inverter en batterye in te sit. Kan u asb eers vir my n kwotasie gee wat dit sal kos om vir my die raad te gee. Groete
In a process of applying for finance from Standardbank for solar installation. I need a qoute from an accredited solar installer so I can submit to the bank. The qoute should include everything, equipments, and installation costs and still be connected to the grid just incase. In my house I have outdoor lights, 2 geysers, stove, pool and indoor lights.
We need a Compliance Certificate as we have sold our house. The following repairs need to carried out; -Tighten x2 packing nuts outside. -Replace x1 hand shower rose, (downstairs). -Service shower taps. (ensuite) -Replace x1 hand shower hose swivel. (upstairs bathroom) -Remove and replace 15mm poly cop front of house and court yard. -Add x1 kitchen mixer head part sleeve. -Install R1 lagging on hot water line 3m Install R1 lagging on cold water line 1m Install R1 lagging on tp overflow 1m -Replace 40mm drip tray overflow to 50mm pvc. -Replace 15mm poly cop to 15mm cobra for prv overflow. -Saddle pipes correctly in roof space. NOTE: upstairs bathroom has a mixer that needs replacement. Client has already bought one
EMAIL ONLY Work to be carried out for Compliance Certificate: Kitchen Replace 3 lever switch - cracked modules Living room Replace plug behind TV - Stuck shutters Garage Rewire garage motor plug. Currently on twin flex. 6m and install 4x4 wondabox and plug. Upstairs living room Replace fused 12v globe Replace plug at wall near steps Stuck shutters Upstairs bathroom Install 5amp isolator for extractor. Fan not running not part of compliance. Check for power. Ensuite Install x3 stream proof fittings down lights Room off ensuite Replace plug under counter and check earth connection Balcony Replace 4x2 plug - rusty. Outside back Replace 4x2 rusted plug in s15 box Roof space Install push gland at round box Install x3 isolators for geysers Install 4x4 surface mount wonda box at flush box and separate cable entries x2 Close connection at corner of roof space Upstairs roof space Install 2x4 surface wondabox in place of flush box and cover. Replace 4x4 flush box with surface mount box and separate cable entries. Bar area. Area tripping faulty transformers. Replace all with v led warm white lights X10. Outside front Install isolator for gate motor Main DB Downgrade 40amp above to 30amp Install blanks to open spaces Label joinery
In a 3.2 ha pice of land situated on a m bank of the vaal marina. 3 modern design houses each with a build size of m^2 to m^2 all having pools and semi ultra modern finishes. By the river bank a modern clubhouse with a build of m^2 with a deck going into the dam. The materiel to be used are concrete and steel mostly with huge glasses and very minimal usage of bricks.
The property is fully walled and will be manned after hours during the week and week ends by one guard in an observation tower and one roaming guard. We require to enhans the lighting with motion sensors, combined with curtain beams and camera observation in the observation tower. The tower guard will have a pannic connection to armed guards
We have already dug open the underground sewerage pipe. Roots of a tree grew into old clay type sewerage pipe. We shall also remove the existing sewerage pipe , 5 meter length. We have already bought the new mm underground sewerage pipe ( 6 meter length) as well as the connecter fittings ( mm ) . We have also bought the river sand which should be placed in the trench underneath the new pipe and also on top of the new pipe. Please quote to place the new pipe.
REQUEST FOR QUOTATION FOR FENCING MATERIALS FOR SCHOOL The matter above refers: 1. We hereby request for a quote for concrete palisade fence for a school. The type of the one on the next page2. 2. Our specifications are: m x m x 1.8m, leaving two(2) spaces of 5m each for two(2) gates. There must be a razor wire at the top. Provide two(2) sliding gates. 3. We are also prepared to have a face-to-face meeting to discuss the matter further. Your positive response is highly anticipated and appreciated