I would like some residential work done. 1. Remove a current chandelier light fitting and replace with a light and fan fitting. 2. Remove a side light fitting - do want to use anymore 3. Check wiring of the above - current chandelier lights tripping 4. Replace one light with another light 5. Fix a faulty light, switches on but goes off after a while.
We require a new manual change over switch installed at/near the db board. New external water proof plug point installed on the outside wall for the standby generator. Replacement of 1 x day/night sensor operating 2 x LED exterior lights. Replace 1 x "jam jar" light fitting. Remove "illegal" cable installtion to exterior plug point and run new T&E cable from exterior plug point to DB board, through newly installed conduit housed in wall.
Solar panels of at least 6kva to run one freezer, 3 door fridge & freezer combo, 2 TV sets, lights and 0,75 submissable.water pump. Quote hybrid inverter and batteries separately from the panels. There must also be charge controllers (MPPT) and be compatible to feed extra power to the manucipality grid when it allowed to do so in the future We want to buy panels the last week February.
Supply and install DB (surface) with earth leakage, ATS, and double pole circuit breaker (10A). ESKOM supply circuit has 3 phases, with phases separated in the house. backup power supply to be done from 2 alternative points: 1. existing diesel generator (RG-I) 2. future inverter/battery/solar system
I would like to have a -litre high-pressure solar geyser system with tubes to replace the electrical one. The roof type is high pitch. I do not need the geyser timer because the electric one is already installed. Due to my busy work schedule, you may consider communicating either via email or whattup, if you do not find me on the cell phone.
I am not currently ready for a site visit, would just like an approximate quote for now based on the following information: I would like a quote for consideration on an 8kW Hybrid Inverter System with 10kWh of Battery and 8 by Wp Solar Panels. Roof is tile with a pitch if 15 Deg facing north, cable run 12m. Inverter in garage which is 6 meter from main DB
Existing W 24V pure sine inverter. 2 x W panels. 4x 12 V lead acid batteries. 24v 60A alternator on 10hp diesel motor supplies about W. I need 2 more W panels. Also 2x 3.5kW lithium 24V batteries. Existing 2 panels to be relocated for max perfomance. Sub DB from inverter handles 5 kW per day. I am hoping to sell the propert soon , therefore would not go to big. Would rather go fullhouse on my property in Port Elizabeth.
intended for use at school of 8 blocks (admin block included), for lights, four printing machines, two photocopy machines, kettle, heaters in classes during winter (can be 8), four refrigerators, five aircons, one geyser. Our school has learners with 40 educators situated at Ext 71 Madiba park in Polokwane.
In a process of applying for finance from Standardbank for solar installation. I need a qoute from an accredited solar installer so I can submit to the bank. The qoute should include everything, equipments, and installation costs and still be connected to the grid just incase. In my house I have outdoor lights, 2 geysers, stove, pool and indoor lights.
EMAIL ONLY Work to be carried out for Compliance Certificate: Kitchen Replace 3 lever switch - cracked modules Living room Replace plug behind TV - Stuck shutters Garage Rewire garage motor plug. Currently on twin flex. 6m and install 4x4 wondabox and plug. Upstairs living room Replace fused 12v globe Replace plug at wall near steps Stuck shutters Upstairs bathroom Install 5amp isolator for extractor. Fan not running not part of compliance. Check for power. Ensuite Install x3 stream proof fittings down lights Room off ensuite Replace plug under counter and check earth connection Balcony Replace 4x2 plug - rusty. Outside back Replace 4x2 rusted plug in s15 box Roof space Install push gland at round box Install x3 isolators for geysers Install 4x4 surface mount wonda box at flush box and separate cable entries x2 Close connection at corner of roof space Upstairs roof space Install 2x4 surface wondabox in place of flush box and cover. Replace 4x4 flush box with surface mount box and separate cable entries. Bar area. Area tripping faulty transformers. Replace all with v led warm white lights X10. Outside front Install isolator for gate motor Main DB Downgrade 40amp above to 30amp Install blanks to open spaces Label joinery