
Flat:COC expired in February . I need a quote first
Roof leaks. Alternative number is
We are just planning on extending the existing rooms.
Urgent: A complex in La Lucia require 7 floodlights to be installed into already existing points (replacing of old floodlights) As part of a Body Corp, We also require the necessary documentation: 1. CIPC registration 2. Letter of good standing - Dept of Labour 3. Confirmation of Banking Details 4. Liability insurance
Need coc for the bank
The property is to be built in a rocky slop site in Jozini Norther KZN rural area, in step platform, making it 2 levels with a rooftop siting area/possible third floor. With balcony decks on the second and ground floor with an infinite pool, facing the Pongola dam from the mountain. The backside must have parking and a double garage. The house must have a 3/4-bed minimum with a master suite, an open-plan kitchen, and a living area opening to the deck and pool. North-facing sustainable eco home with a view.
Looking at maybe getting the chromadek Harvey tiles installed but looking for the best option.
I am in the process of buying a plot and need someone to advise me the best with regards to building plans and how the process works.
I want to put up a Nutec home in my backyard and need to have this put on a plan.
I am looking to draw a plan and redesign the roof of the home. It is currently a flat roof.