Good Day, I am looking for someone that can assist with a boundary wall - I either need the current vibacrete wall to be removed and install a new 1.8 m vibacrete wall or have a normal brick wall built around the property. This is for a children's home that we are assisting in getting their security upgraded. Thank you
• the storeroom light works but only at night as its linked to all the other communal lights in the building that only switch on at night ( all linked to a timer which is linked to the main DB , next to the storeroom). So, the storeroom light stays on all night which is a waste. As do all the garage lights as well. • We need to separate the Storeroom light switch from the timer so it can be a standalone switch. • the communal area is the one that needs to go on a daylight switch
The project is a campus for a primary and high school. Precise measurements are pending. I would like a preliminary quote based on the information available on the rough draft. Ignore the measurements on the draft, take into account the number buildings and rooms. Ignore the distances between the buildings as that is also subject to change.
Good day, I would like an assessment to be done at Grey Hospital on an already installed AC. It has not been serviced and it is currently not functioning. Thereafter the assessment, a determination can be made. A quote on a new AC installation and servicing plan would be most appreciated. Your prompt response would be greatly appreciated. Regards
Need to connect a 3 wire Franklin Electric borehole pump to a modern switching gear also from Franklin Electric - The insurance guy disconnected the pump from the old box and said the box was faulty, thus got another better box. Thus no indication which wires are connecting where, thus testing of motor to be done. Box is already fixed to the wall and only need the connection to the pump and providing of a CoC for insurance purposes/
There’s an existing Boundary wall that needs to be demolished and reconstructed the wall is out of municipal lines and is built on top of the drain but the main reason for demolition is because the boundary wall wasn’t built prope from the first place. I need plans for a Garage and 2 Flatlets each with own toilet and shower.
Currently three separate rooms 1) small shower 2) small loo & basin. 3) loo + shower + basin & vanity. Required : knock down 2 walls, lift floor and wall tiles, cement/screed floors and walls, install one large wet room with 1 wall mounted loo, one large shower, one basin with vanity and one bathtub. I'd like exposed copper pipes throughout.
LEVER, MANUAL CONTROL: TYPE: HANDLE SHAFT; DIMENSIONS: WD X LG MM; MATERIAL: PLASTIC; SHAPE: T BAR; FEATURES: HANDLE; OEM P/N: 8UD-3AF21, OEM: SIEMENS PROPRIETARY LIMITED; DOOR COUPLING ROTARY OPERATING MECHANISIM STANDARD WITH TOLERANCE COMPENSATION SIZE X MM; SHAFT 10 X 10 X MM; TEST 0-1; COMPLETE UNIT HANDLE MM ACCESSORY FOR 3KD SIZE 4; 3KF SIZE 4; COMPLETE UNIT HANDLE MM ACCESSORY FOR 3KD SIZE 4; 3KF SIZE 4; DESIGN OF THE PRODUCT STANDARD WITH TOLERANCE COMPENSATION; DESIGN OF HANDLE: GRAY; DESIGN OF THE DOOR LOCK SYSTEM: DOOR INTERLOCKING; SIZE OF CROSS SECTION OF THE SHAFT OF DOOR COUPLING ROTARY OPERATING MECHANISM 10X10 MM; SHAFT: 8 X8 MM; LENGTH OF HANDLE: MM; LENGTH OF SHAFT OF DOOR COUPLING ROTARY OPERATING MECHANISM: MM; PROTECTION CLASS: IP 65; VENDORS ARE RESPONSIBLE FOR ENSURING THAT THEY ARE PERFORMING AGAINST THE CORRECT DRAWING REVISION NUMBER (IF APPLICABLE). I WANT 14 OF
Good day, You once came to repair, service and move the outside aircon unit at my place. However, the challenges continue with water still being discharged in the house and not outside. I would therefore like to remove this aircon, specifically the outside unit until I have decided on whether I put in a new once or a used unit. Regards
1. Complete toilet make over, toilet pot, basin, shower, move geyser and tiling 2. Build block wall in lounge on side and infront and put in sliding door 3. Open up bedroom and build wall 4. Ceiling in lounge areas with cornice and skirtings and do floor with tiles 5. Put roof on side alley with gutter and cement the floor 6. Fix 2 potholes in garage 7. Build wall along side of lounge and bedroom to the back 8. Put double kitchen sink in kitchen 9. Remove kitchen sliding door and put in lounge and close the area with blocks in kitchen area where sliding door was removed. 10. All walls must be plastered as well.