How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
Electrical maintenance
First floor bathroom has damaged wooden floor. Floor to be replaced, as well as new shower and toilet. Bath and basin to be reused. New floor covering, new wall tiles, new taps.
Require a double garage build with two rooms .Extension to lower lever kitchen and lounge .Upper level 2 rooms Bath and Study with balcony
A rectangular house with a vaulted ceiling extending the length of it supported by steel or wood trusses in between, the build. The dimensions are 7 x 14 m and 3.2 m high.
Double garage conversion into 2 bed 2 bath holiday let with deck and balcony.
Hello I need a building/renovation quotation for an existing structure. Thank you Regards
Need roof sheets replaced