Everything
Services: AC servicing, Solar panels, Aircon, Electrical installation, Electrical wiring, Photovoltaic, Electrical repair, Emergency electrician, House wiring, Portable AC, Electrical certificate of compliance, AC repair, Electricians, AC installation, Solar panels installation, Electrical companies, Solar energy, Air conditioning, Electrical contractors
I need rstimayed quotes electrical compliance for two properties . Include in property 2 the repair of trip switches and 2 plugs in kitchen and 2 faulty lightfittings with possible wiring problems. 1) House in complex . 3 bedrooms lounge dining room kitchen 2 bathrooms garage. 2) 2 bedroomed semi detached house in complex with 1 bathroom kitchen lounge dining area. Urgent please.
Hi. Recently bought a house and there's no wiring or DB board. There are outlet points but no outlet, no light switches and no lights (there are holes for the plugs and switches already) It is a 3 room house and a granny flat at the back that has a small kitchen and bedroom and bathroom. Need quote for the house and for the single flat (need 3 separate quotes, house, flat, house and flat)
Hi there, I have some questions regarding the installation of 6 solar panels and associated components. I am busy on phonecall meetings for the next hour, I will be available for discussions after that. What would you charge me for installing the following: 1) Deye 5Kw single phase hybrid inverter. VOC V; Battery: 48V CT & Wifi included (what would be different if one used an 8kW inverter? i.e. cost versus benefits) 2 Volta Battery Lithium 5.1kW; 48 V Ah, Stage 1 3. Six solar panel W monocrystalline PV module Tier 1 Thanks,
We are school which has over learners. Our electricity bill during winter is over R25 . We have photocopying machines and printers that are running everyday at our admin block. We want to start the installation at the admin block first before we can expand and put the whole school. The admin block must always function. It has: 1. It has photocopying machines that are alternated depending on the demand for papers (two machines work during the examination season) 2. Five heaters 3. Two bar fridges 4. One microwave 5. 11 rooms for lights including the corridors 6. An alarm system.
Goeiemore Ek is deur ESKOM Munisipality Departement na u verwys vir die verkryging van n Kwotasie vir die instalering van Elektrisiteit met die opening van n factory in Upington. Die projek word begin as n Start-up uit Containers. Ons doen Tradisioneel in n pot op Gas-stowe dus benodig ons slegs elektrisiteit vir die volgende : - Sealers, Vodacom Package ( 3 x Wireless Phones + 3 Laptops ) , Earn + Microwave, moontlik vir 2 x verwarmers en laastens vir Ligte Hoop u kan my so gou as moontlik van n Kwotasie voorsien, JJJonkers
Room 1 new double point plug point with box and calvinized pype 2 existing plug point with new box and double point plug 2 blank box and cover for unused underfloor heating point 2 existing light box and dimmable toggle switch 1 new light switch with box and dimmable toggle switch 3 light fittings installed Living area 10 new double point plug point with box and calvinized pipe 6 existing plug point with new box and double point plug 1 oven point with new box and isolator 2 new light switch with box and dimmable toggle switch 8 new light switch circuits 6 dimmable globes cool white for spots lights 6 new light switch with box and dimmable toggle switch in calvinised pipe and fittings installed 2 move and adjust light fittings Stairs 2 existing light box and dimmable toggle switch 1 light fittings installed Sub DB 1 split of circuits fo non essential and essential
Please email me, I will then respond from there. "SCE" portable electrical oil finned heater defective (not switching on). LED on on-off switches also not illuminating. Thermostat makes clicking sound when turning lever. Already tested on alternative power supply without successes. Require quote to repair.
Our HWC switch on the main electric panel has been tripping for the passed week, I thought I repaired it by resetting the main and earth switches but the problem persisted days later. I noticed that the resistance of the HWC (geyser) switch is weak, which I think is the cause of it immediately falling down once pushed up.
What would the estimated full installation costs be for a stand-by PV system versus a single large generator for an old-age complex of say 80 homes (ranging from single to 3 bedrooms). Most of them are in clusters of 4 adjoining homes. In addition, there is a Care Centre of 10 units plus a separate office for 2 staff members. We live in Hayfields, Pietermaritzburg. We have many power outages so struggle with signal issues, please try the number above between 10am and 12pm or alternatively, email me.
Five room with double garage and bathroom kitchen with three separate double plugs and one single plug and sitting room with two separate double plug, the other three rooms each with two separate double plugs, eight outside lights operating with day/night sensor one plug in garage and two bathroom and isolator for stove. Each room with single switch and two passage switch and light in veranda.