How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
Need to hire 2 Painters for 2 Weeks asap, assist in painting Factory.
I need shower or bathtub repair
ASAP
I need the walls to be smoothly plastered and painted. The current plastering design want it changed to smooth. It's 3 bedrooms, open kitchen and lounge.
I need a plumber
Blocked kitchen drain
i drilled a hole in the wall and drilled into a pipe do not leak so must but it is leaking