QUATION OF 48SQM STUDIO ROOM KITCHEN BATHROOM OPEN PLAN CEILING AND DRYWALL ON TOP OF POLES 2.4M.HEIGHT FOR CAR PARK UNDERNEATH 5ALUMINUM WINDOWS X IBR ROOFING 2 to 4 ALUMINUM SLIDING DOORS PLUMBING AND ELECTRIC IS INCLUDED BACIN ,TOILET, SHOWER, ALL FIXED AND SUPPLIED PLUGS AND LIGHTS, WIRING DB BOX,SWITCHES FIXED AND SUPPLIED Something similar to the picture attached, but preferably not wood, steel, concrete, prefab anything else
2 toilets are running. I have to turn the water off to stop it running. 1 toilet is dripping at the pipe heading into the loo. The top element in the oven isn't working. Is this something you can look at? One recliner's mechanism is broken. Pull the lever and nothing happens Please send me a WhatsApp message before calling as I don't often answer foreign numbers.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Front part of new house needs roof installed. I have some trusses left that was also used in back part of house that is already installed. Approximately m2 left to be done right away. I have all the tiles already. House is in Mooivallei Park Potch. I need a roofing carpenter to ensure the job is done right. Additional m2 roof will be needed on second level but not urgent right now.
we have been renovating some of the house over the last couple of years, but we are looking to upgrade so that we can sell the house for more. upgrading includes a full renovation of the kitchen and scullery area, upgrading two bathrooms, replacing all the window frames and flooring, skirtings, fireplace, painting and stiling the 5 bedroom house.
Hi, I urgently need a quote please for some repairs on a property rental in North End. It's my moms property and she's battling with the tenant. Please let me know urgently if you can assist with a quote on repairs. Kitchen cupboards, counter top replacement, toilet seat replace, fix bedroom cupboard door, soap dish in bathroom ect.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
We are in the process of purchasing a home and from the engineers inspection, it looks like we may need a roof replacement/repair as the clay tiles are old. The structure is still in tact. I'd like to get a quote to understand potential future costs in the next couple of years. I would prefer contact via email or whatsapp. Thanks!
Please I would like to have a quotation of a building that has a floor and ceiling that is damaged because of an air handling unit that is placed on top of timber floor. The ceiling below that floor is also affected. Please I would like to have the following in the quotation: 1. An investigation on the cause and extend of the water damage on the floor/ceiling. 2. On top of the timber floor there is a torch-on waterproof. What is the rate of the waterproof when it is removed and when it is replaced with new. Thank you. Kind regards,
The roof leaks when it's raining but the exact points of leaks are uncertain since half of the house has an installed ceiling. The main objective is to find the exact leaking points and repair them and recommend any improvements on the roof. The plan area of the roof is approximately square metres. The style of roof is scotch. The location of the house is in Boschfontein, Nkomazi Local Municipality.