We have a very old 3 bedroom house that has not been lived in for 40 years. It's a square meter house. The house's electricity runs off a super old diesel generator. We basically want the entire house's electrical to be redone and then put it onto solar power and off grid. Send me a WhatsApp and I can send photos and videos.
We have sold our property at Louisvale dorp. We have a valid COC, but afterwards, the buyer saw things he does not feel comfortable, request a new COC. We need urgently someone to go and have a look at all things on the current COC, and release a new one. It's very urgent and I will appreciate feedback as soon as possible, thank you.
We want to extend an existing 3 phase connection with about 15 meters (and drill through 3 walls). We need to connect 3 normal ovens and stove top units (probably about 8kw) + 1 deck oven ( like this: https://www.absolutecateringequipment.co.za/product/single-deck-oven/) to this three-phase connection (in a separate circuit box). If we can add a meter to measure what is being used in this three-phase extension (in that circuit box), this would be good. We also need to know if this extension might require a higher amps circuit breaker on the existing connection.
Need pricing on a full house rewiring. Square meters is m² x two floors. Double storey house that has been vandalized. Need pricing on the following items: Single plug point Double plug point Light point Downlight point Wiring per square meter DB point Aircon point Geyser point Stove point Outside plug point Gate motor point Outside light point Outside wiring per square meter
I would Like a quote to supply and install a 3 KW inverter with Battery Back Up, Lithium-ion or battery bank capable of supplying power for 4 Hrs, the equipment I have is a fridge microwave two desktop computers a server box and Printer I have had countless hours of additional power outages beyond Eskom Load shedding. the inverter would be Mounted next to the DB as well as the Battery Bank would also require a COC for the Works regards
install 9 double plug points chasing has been done, we will supply plugs, install 4 light switch points, most wiring is done new outdoor double plug we will supply 3 ceiling fans with remote control in existing lights 2 new single plugs in kitchen for extractor fan and ignition on gas oven, chasing done, we will supply plugs new junction box in bedroom ceiling some extras this job is very urgent as we were let down
We need advice on what needs to be done to obtain a COC. It is a farm / rural/ setting. We then need a COC to be issued when compliant as well, We were also advised to rather remove unnecessary items like pumps for water fountains, "pretty stoep lights" and self installed leads etc. The are three Eskom low amp boxes on the property that feeds each building
Good day Sir / Madam I trust this email finds you well. We are kindly requesting you guys come and do a site inspection at 90 Bekker Road, Vorna Valley Building A, Hertford Office Park, Midrand ( Do advise when you can come through) on the following request, • 5 Red plugs with 5 external multiplugs • The plugs must be round on the LIVE POINT ( not a half hole please ) • The plugs will be mounted on the poles and external multiplugs can be connected externally there ( picture attached ) The quote must include the following: • Labour rates ( For after-hours) • Show us a consumable explanation of the reg plugs in terms of power usage • installation costs (Including Cabling on walls and desk to the Genset)
I have 8 x Qcell watt panels that I need installed on my tiled roof north facing All installation materials are needed as well as cabling to take the 96volt 40 amp feeds from the roof through to my garage. Need costs for roof install Need costs for cabling install Need costs for isolation / fusing box install Regards
We have a challenge rolling blackouts all the time in Fort Beaufort. I need single phase Solar installation that can supply the house with at least 40A in times when they is a grid failure and batteries that can be charge from the grid as well as from PV The batteries must be able to supply the power for at least 10 hours.