BURST L ELECTRIC GEYSER
gas geyser is lighting and heating for 20 seconds and then cuts out. Full gas bottle.
Blocked drain
One layer of Derbigum CG3 and one layer of CG4 with bituminous primer applied with torch-fusion.
Leak behind toilet wasting clean water.
Replacement of the whole toilet system!! company must be registered on CSD and tax compliant. need email address's to send request for quotation with specifications
Open plan
A small, modular Recovery Plant is required that will be fully enclosed. To fit all the major pieces of equipment the building exterior high will be about 10m, width roughly 6m and length about 8m. The interior will house the equipment, when fully operational these pieces of equipment together will approximately weigh about 12tons - therefore the interior needs to have a steel/iron structure that holds these pieces in the correct position. To access all parts the structure would need to have a staircase. Ideally the building will have good ventilation to regulate the temperature inside the buidling.