Goeiemore Ek is deur ESKOM Munisipality Departement na u verwys vir die verkryging van n Kwotasie vir die instalering van Elektrisiteit met die opening van n factory in Upington. Die projek word begin as n Start-up uit Containers. Ons doen Tradisioneel in n pot op Gas-stowe dus benodig ons slegs elektrisiteit vir die volgende : - Sealers, Vodacom Package ( 3 x Wireless Phones + 3 Laptops ) , Earn + Microwave, moontlik vir 2 x verwarmers en laastens vir Ligte Hoop u kan my so gou as moontlik van n Kwotasie voorsien, JJJonkers
Room 1 new double point plug point with box and calvinized pype 2 existing plug point with new box and double point plug 2 blank box and cover for unused underfloor heating point 2 existing light box and dimmable toggle switch 1 new light switch with box and dimmable toggle switch 3 light fittings installed Living area 10 new double point plug point with box and calvinized pipe 6 existing plug point with new box and double point plug 1 oven point with new box and isolator 2 new light switch with box and dimmable toggle switch 8 new light switch circuits 6 dimmable globes cool white for spots lights 6 new light switch with box and dimmable toggle switch in calvinised pipe and fittings installed 2 move and adjust light fittings Stairs 2 existing light box and dimmable toggle switch 1 light fittings installed Sub DB 1 split of circuits fo non essential and essential
Please email me, I will then respond from there. "SCE" portable electrical oil finned heater defective (not switching on). LED on on-off switches also not illuminating. Thermostat makes clicking sound when turning lever. Already tested on alternative power supply without successes. Require quote to repair.
Our HWC switch on the main electric panel has been tripping for the passed week, I thought I repaired it by resetting the main and earth switches but the problem persisted days later. I noticed that the resistance of the HWC (geyser) switch is weak, which I think is the cause of it immediately falling down once pushed up.
Five room with double garage and bathroom kitchen with three separate double plugs and one single plug and sitting room with two separate double plug, the other three rooms each with two separate double plugs, eight outside lights operating with day/night sensor one plug in garage and two bathroom and isolator for stove. Each room with single switch and two passage switch and light in veranda.
owns a building in Lichtenburg with 3 bathrooms. Each bathroom has its own toilet and the male bathroom has a urinal as well. There is a nauseating smell coming from the male bathroom. The adjacent offices as well as the boardroom is severely affected by this. The toilets are also not flushing away all the toilet paper. We had a local plumber visiting the premises and his opinion is that we will have to replace all toilets as well as the urinal as the pipes and connections are too old and worn out. We are attempting to get this done through our building insurers. We urgently need your assistance with the following to submit our claim: The smell is unbearable • Damage report confirming the cause of damages for each item claimed • Quote to repair / replace
The scope of work is of simple and straightforward nature: 1. Outside tap is leaking between the copper pipe and the sealing nut. 2. Kitchen tap is also leaking, see attached photos for a better view 3. Main bedroom toilet, when you flush it sometimes water runs non-stop sometimes the operation works perfectly. You will be expected to provide a Bill Of Material as I will buy the material myself from the nearest plumbing supplier shop.
4 bedrooms 1 bathroom in the main 1 bathroom for the rest of the bedroom s Sitting room Dining room Kitchen Double garage 10x outside led spotlights 2x outside normal lights 1x socket outlet for geyser Please include 2 quotes 1 with downligts, chandeliers and special lights in the bedroom and family rooms 1 with normal lights and normal plugs Please also include labour cost and call out charges so I can know how much I must budget for. Thank you
Urgent: A complex in La Lucia require 7 floodlights to be installed into already existing points (replacing of old floodlights) As part of a Body Corp, We also require the necessary documentation: 1. CIPC registration 2. Letter of good standing - Dept of Labour 3. Confirmation of Banking Details 4. Liability insurance
I have a secondary DB board for a cottage. The cottage is fed either from eskom or my solar, but the cottage geyser drains the solar battery. There is a meter in the secondary board. The work I require is either to run a second wire from the main board to the second board for the geyer and have a second meter, or to take a feed from other circuits in the secondary board to feed some lights and plugs from the solar during load shedding - also requiring a second meter I think. Hopefully there is space in the board for a second meter. Then there is a circuit that is disconnected because it caused a leakage trip, probably due to a shared neutral, shared between the main and secondary boards.