We need help renovating our home we are purchasing. Its a 3 bedroom townhouse in a complex. We anticipate geting most of the rooms carpeted, sitting room as well as the stairs. The bathrooms (2) also need a retouch, and in the balconies we would like to close off with clear glass slide doors, as well as maybe add in a small room/storage area on the ground level on the garden side.
In the process of purchasing a fixer- upper and would like an idea of remodelling costs. Looking at a 3 bedroom flat in need of a strip out of old carpentry and flooring, paint and fit out including new kitchen, bathroom, toilet, wardrobes and refurbish of flooring. Looking to do this on a budget and keep costs down. Hoping for a functional and clean finish.
Not sure about the size.Renovations includes the lounge, but not the whole floor plan.With what has been done I'm not happy and would like to change not major but need advise. 2 bedrooms and bathroom,need advise.remodeling of the kitchen.If possible I would like to have an interior designer/architect as well to assist with advise.Any recommendations will be appreciated.Thank you
I want to extend my master bedroom by about 2.5m. Width of the bedroom is 4.0m. Roof height about 2.5m In the attachment: The dark grey walls are the existing bedroom. The cavity currently contains a window and a door, which will have to be removed and are not suited to reuse. The pink walls are for the extension. The thin pink line is a window. The slatted pink is the roof. The roof is flat and just an extension of the patio roof. No cupboards. Floor probably tiles.
Scrape off all loose paint open all cracks , prime and fill Cut all expansion gaps and fill with Sikeflex Rubberseal all parapets and areas where fine crack appears Repair and use anchoring cement for all major cracks clean gutters and repaint facias Prime and seal all repaired areas Attend to damp problems Paint all wall with 2 coats of plascon wall seal on house and boundary walls Check waterproofing on roof side of parapet Rubberseal ridge capping Check for broken tiles Waterproof all joints and valleys ( including garage roof Coat entire roof with 2 coats
Scrape off all loose paint open all cracks , prime and fill Cut all expansion gaps and fill with Sikeflex Rubberseal all parapets and areas where fine crack appears Repair and use anchoring cement for all major cracks clean gutters and repaint facias Prime and seal all repaired areas Attend to damp problems Paint all wall with 2 coats of plascon wall seal on house and boundary walls Check waterproofing on roof side of parapet Optional extra ( roof special) Rubberseal ridge capping Check for broken tiles Waterproof all joints and valleys ( including garage roof Coat entire roof with 2 coats
We have a house at the Vaalriver in Orkney Klerskdorp. We have a toilet on the one side then we have a wall that use to be a build in cupboard and on the other side of the wall we have the basin and shower. We would like to brake the wall down to have a open plan bathroom. Then we need to purchase a new toilet, install a corner bath and upgrade the shower a little bit with a new shower door and new taps, it only has a shower curtain at the moment.
1. Installation of patio stoep concrete slab= 9 square metres for tiling 2. Installation of outside entertainment area concrete slab for tiling = 12 square metres 3. Renovation of outside entertainment area including replastering and renovation of braai structure to accept fabricated standard mild steel braai unit 4. Installation of appropriate lighting for entertainment area
Current three-bedroom house require renovation into four-bedroom ensuite double storey house with eight metre long double garage. Plan (not approved/submitted to municipality). 1) Ground floor (1-bed, lounge, kitchen, and outside bathroom), 2) First floor (3-bed & study - all with veranda), We consider starting with ground floor...
I am moving into a new house and I want to change the wall colour in the lounge from a bright blue to Plascon’s Antique Petal (off-white/creme). The room is approximately 20sqm with only two full walls. (See attached photos). The contractor needs to have their own equipment. I would like for painting to commence on 14 December.