How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
My entire home needs to be repainted.
I want a 3 bedroom house
Extention of a loung with an indoor braai area plus a heated swimming pool, also to extend an en suite bedroom I've got building plans, still waiting for approval for building plans. I want to begin in Jan/Feb
A 6' foot boundary gate pillar and section of the wall was hit by a car and damaged. The pillar must be rebuilt from foundation level along with the wall on one side for about 1.5m X 0.8 high (4.5" wall). It is to be splatter plastered and repainted to match existing.
Hi I have a house i need to build in vygeboom dam estate
The ground floor,slub, columns and body structure is done and first floor and upwards not yet completed