Need plaster ceilings with shadow line and rhinolite 1 x x trap door Ceilings m2 ceilings Plaster trim m Paint m2 1st 2nd 3rd coat Main house: Garage needs drywall 6m x 2.7m height straight wall to close up the garage doors opening and then pvc ceilings mat white 36m2 with grid and trap door x cornice cove 75mm x 24m Painting of inside walls 65m2 garage under coat only
A small, modular Recovery Plant is required that will be fully enclosed. To fit all the major pieces of equipment the building exterior high will be about 10m, width roughly 6m and length about 8m. The interior will house the equipment, when fully operational these pieces of equipment together will approximately weigh about 12tons - therefore the interior needs to have a steel/iron structure that holds these pieces in the correct position. To access all parts the structure would need to have a staircase. Ideally the building will have good ventilation to regulate the temperature inside the buidling.
1. I have a small section of wall that is falling over. 1m high wall that holds back the yard work and is about 3 M long that will have to be broken down and rebuilt. 2. We want to plant grass in front yard. Grass needs to be able to withstand a lot of traffic of a dog running up and down and be able to survive shaded winters and in the sun summers. Not sure if this is possible. 3. We want to move our pool to a new location. Ideally rebuild new pool but if better to just move current shell also open to that. Would have to explain in person. We have a terrace wall that is breaking away and will have to be rebuilt and when swimming pool is moved the hole must be filled and everything will have to be repaved. An in person estimate would be best as there are a few moving parts to quote on.
Our jetty was damadged by strobg winds. It cknsists of three parts: fixed platform, a walkway onto the floating jetty. bracjets, and beam conections need to be replaced. Most of the railings need to be replaced. Many of the floor planks need to refastend or to be replaced. plaesant on the edge of the Groenvlei lake, just off the N2 on getting to Sedgefield.
Phase one: 1. Installation of 3.6 k Deye Inverter SUN-3.6K-SG03/05LP1-EU R65’- 2. Installation of geyser solar panel Phase two: 3. Renovation of main bedroom en-suite 4. Installation of two more plug points Phase three: 5. Renovation of girls bathroom. Phase four: 6. Removal of jacuzzi 7. Build on new bedroom / guest room / office Phase five: 8. Extend back corner Phase six: 9. Remodel kitchen to open plan. 10. Replace tiles Phase seven: 11. Laminated flooring a. Lounge, dining room b. Upstairs open area c. Main bedroom d. Girls bedrooms e. New bed room f. New back extension. 12. Stairwell floor stickers Phase eight: 13. Cover wall tiles with decorative design Phase nine: 14. Lapa in back garden 15. Built in braai Phase ten: 16. Artificial lawn back garden 17. Flower bowls
3 bedroom house with open floor kitchen (possible to fit an island table) and lounge, main bedroom en-suite and the 2 bedroom share a bathroom. Flow Garage can fit 2 cars back to back and drive way. Maximum back space and minimum front space. The yard space is meter square and the can be around - meter square.
Good day Hope you are well.. I have a project of about 10 rental units that are going to need basic electrical installation for all rooms and building . I would like to receive a quotation according to the building plan as it is. i will attached the building plan layout for a more specific quote. Thank you
Full renovation including kitchen remodel, small guest loo remodel, vinyl flooring for about sqm, paint all walls, stacker doors at entrance, new light fixtures, relining pool, enclosing an 8sqm courtyard to form part of the kitchen as a scullery, removal of pillars in the living area which take up unnecessary space (engineer has said its possible with box support beam).
I would like to remove a 4m long wall separating the kitchen and dining room area to create a more open plan house. I suspect I will need to put some sort of supporting beam at the top to support the roof structure. I live in a semi-detached house in the woosdtock area, the house is >60 years old and has high ceilings. I don't know where I would need to start to get approval for the change and plans to ensure I don't break anything. This is where I would like the most help. Finding a contractor thereafter is not something I'm worried about.
Office building 1. Reception Area: We need a welcoming and professional reception area that represents our company’s image. 2. Boardroom/Conference Room: A spacious and well-equipped room for meetings and presentations. 3. 2 x Executive Directors Offices: Offices that provide privacy and comfort for our executive team. 4. Cashier Office: A designated area for cash handling and transactions. 5. Marketing Manager Office: A dedicated office space for our marketing manager to strategize and plan. 6. Store Room: We require a spacious and functional store room within the office building to accommodate our storage needs. Please provide an estimate for the design and construction of this space, including any necessary shelving or storage solutions. 7. Ablution Facilities: Both male and female ablution facilities are crucial for our office 8. Kitchen: We require a well-equipped kitchen in the office building to cater to the needs of our employees. This should include necessary appliances and adequate space for food preparation. 9. Security building: As security is of utmost importance to us, we need a dedicated security building within the premises of the office building. This should include surveillance systems, access control