Leaks. 2 main areas of the house: 1) front (area 1) 2) back (area 2) Front = Garage area (area 1) Back = Where new extended part of house and old extended part meet. Garage Multiple leaks at garage area that causes floor to be wet and mouldy when it rains. In garage there are beams, and at one location there is a vertical rise (wooden planks), with eroded plastic insulation. Gaps in between wooden planks as well. And then, is it leaking in other parts of roof as as well? Area 2: Over time, wear and tear occured where the two parts of the house meet (old and new, roof). Likley in the insulation structures.
Semi detached - need only my side inspected and advised on for full roof repair or replacement, really not sure. Rain gets in from I dont know where and ceilings are affected over winter. Really need help without the costs to advise but need to do something so it doesnt get any worse and it is fixed to last for another 50 years
I would like a quote on waterproofing my roof external and paint it, as well as painting the house all around the exterior, I also need waterproofing for winter inside where water tends to run down from the gutters side. It gets worst in winter so before the weather gets worst I would like to have the house painted.
I’m looking to fix my property due to the damages that were caused by a tenant. Here is the list of areas that need painting: 1. The ceiling needs painting approximately 5x12 meters 2. The bedroom wall that the tenant painted with a different shade. It measures about 3x5 meters. 3. This wall needs to be fixed and painted. It measures about 3x0.5 meters. 4. The wall on the left needs to be repainted it measures about 3x7 metres. 5. The whole bathroom needs painting and the dimensions are approximately 5x1.5 meters around 3 walls and the other wall would be a 5x0.5. 6. The area around the switch needs to be fixed and painted.
The interior walls need to be painted for the following rooms: Kitchen Living Room 3 Small Bedrooms 2 small bathrooms Additionally, the ceiling needs to be painted in the main bedroom and ensuite bathroom. Additionally, 6 doors need to be painted.
Painting
On painting , Preparation . Go to the site .measure the surface area .calculate meterial needed Wall preparation . Fill holes .scraping where is needed Lobouring .Mixing paint using tinter etc Rolling
sqm office, could you please quote - light grey and one or two wall turquoise blue. I will be at the office site on Wednesday 2 July between 2pm and 3.30pm. Killarney Race Track second entrance - please Whatsapp me if you are able to come and quote. The offices needs to be done asap. Please see the images attached Thank you
When you are painting firstly, put a musking tape, secondly make sure the area needed to be painted must be clean, thirdly mixing well the paint before you use, apply primer coat give it some time to dry, apply first coat give it some time to dry also,, apply second coat give it some time to dry and apply finishing coat.. painting is done
Hello, my name is :) I am trying to find out if i can start an architectural art installation for a treehouse design. It would be a cover for the rooftop balcony and basically needs a funky shape. I have attached a concept design so far. I hope it wont be too complex and i think it can work with the structural shape of it. I hope. Thank you and hope to hear from you soon! Kind regards, .