4 bedrooms 1 bathroom in the main 1 bathroom for the rest of the bedroom s Sitting room Dining room Kitchen Double garage 10x outside led spotlights 2x outside normal lights 1x socket outlet for geyser Please include 2 quotes 1 with downligts, chandeliers and special lights in the bedroom and family rooms 1 with normal lights and normal plugs Please also include labour cost and call out charges so I can know how much I must budget for. Thank you
Urgent: A complex in La Lucia require 7 floodlights to be installed into already existing points (replacing of old floodlights) As part of a Body Corp, We also require the necessary documentation: 1. CIPC registration 2. Letter of good standing - Dept of Labour 3. Confirmation of Banking Details 4. Liability insurance
I need: +/- 10 pictures hung; washer/dryer properly installed; some furniture assembled; a plug point changed and plug covers put on 2 plug points; a bathroom mirror re-hung; some kitchen hooks put up; a plug extension properly (firmly installed); my balcony weather-proofed; a laminate shelf installed in the kitchen; glass doors and window cleaned. If you can help much appreciated
Wooden windows maintenance. Exterior maintenance of: 1x 7mX1.8m (6x panels - 3x fixed, 3x sliding) - treated, natural 2x 3mX1.8m (2x side hung openings, 2x skylights) - painted, white 2x 2.25mX1.8m (2x side hung openings, 2x skylights) - painted, white 2x 2.25mX1.5m (2x side hung openings, 2x skylights) - painted, white 3x 0.9mX1.5m (2x side hung openings) - painted, white.
I have a secondary DB board for a cottage. The cottage is fed either from eskom or my solar, but the cottage geyser drains the solar battery. There is a meter in the secondary board. The work I require is either to run a second wire from the main board to the second board for the geyer and have a second meter, or to take a feed from other circuits in the secondary board to feed some lights and plugs from the solar during load shedding - also requiring a second meter I think. Hopefully there is space in the board for a second meter. Then there is a circuit that is disconnected because it caused a leakage trip, probably due to a shared neutral, shared between the main and secondary boards.
This enquiry relates to a single story 3 bedroom house that is nearing the end of renovation and probably be put up for sale in two or three months. As far as I know , a registered electrician has worked on tbe house recently but don't know what was done. However I know that another one has to inspect and advise on any repairs required. I think the house is approx 50yrs old
JOB LIST: Electrical: Main Distribution Board: → Put geyser on earth leakage. → Underrated jumpers to be amended. → Cover to be earthed. → Install fed from label. → Install danger label. Bedroom: → Secure loose plug. Patio: → Replace broken round outside light fitting. Geyser: → Label isolator. → Issue certificate.
I need electrician to install a backup power system on a house. All components: batteries, inverters, wires, connectors ect will be supplied. The batteries and inverters will be installed in the garage of the house, power will run from the main db board to the inverter to charge the batteries, then back out from the batteries to the inverter to the db board into the house.
We have a house at Zimbali that we rent out and needs a few touch up, paint from dampness, outside maintenance (wall cleaning etc) painting on the inside, check the roof for any damages as there is dampness coming through, painting inside, bathroom ceiling, cornices, cupboard shelves to be replaced etc.
Hi there, We're buying a house in Faerie Glen PTA and are challenging the electrical compliance. We need a quote for the work needed to bring the property to compliance, plus potentially a few additional fixes, plus issue of new electrical certificate. Could you please let me know if you are interested in quoting?