Good day, We had the house inspected for the purpose of obtaining the compliance certificate and the following defects were noted. Kindly a quote for the following repairs: • Main DB: all C/B not legible to be replaced • Stove: isolator to be replaced • Cooker plug to be rectified • Kitchen: plug to be rectified • Kitchen: 2nd plug to be replaced • Kitchen: open wires to be rectified • Kitchen: light to be replaced • Kitchen: switch to be replaced • Bedroom 1: plug to be replaced • Bedroom 1: to remove cable ties from plug • Bedroom 1: light to be replaced • Flat: 2x light to be replaced • Flat: switch to be replaced • Lounge: plug to be replaced • Lounge: plug no power to be rectified • Only Wiring to light to fit light fitting • Lounge: switch to be down graded to code • Back of house: light to be replaced • Bedroom 2: light to be replaced • Bedroom 2: switch to be rectified & to fit missing gland • Bedroom 2: plug to be replaced • PLEASE NOTE: ROOF SPACE HAS NO TRAP DOOR • ALL EARTHING TO BE RECTIFIED AS PER CODE. Regards,
Good day, We had the house inspected for the purpose of obtaining the compliance certificate. The following defects were noted. Kindly provide us with a quote for the below repairs: • Main DB: all C/B not legible to be replaced • Stove: isolator to be replaced • Cooker plug to be rectified • Kitchen: plug to be rectified • Kitchen: 2nd plug to be replaced • Kitchen: open wires to be rectified • Kitchen: light to be replaced • Kitchen: switch to be replaced • Bedroom 1: plug to be replaced • Bedroom 1: to remove cable ties from plug • Bedroom 1: light to be replaced • Flat: 2x light to be replaced • Flat: switch to be replaced • Lounge: plug to be replaced • Lounge: plug no power to be rectified • Only Wiring to light to fit light fitting • Lounge: switch to be down graded to code • Back of house: light to be replaced • Bedroom 2: light to be replaced • Bedroom 2: switch to be rectified & to fit missing gland • Bedroom 2: plug to be replaced • PLEASE NOTE: ROOF SPACE HAS NO TRAP DOOR • ALL EARTHING TO BE RECTIFIED AS PER CODE. Regards
I am looking for quotes for splitting the pipework in 6 unit complex so that each unit has its own incoming water supply and install a stop valve per unit. We require this so that we can install prepaid water meter. So if you can offer prepaid water meter as well and make it one inclusive quote , that ill be highly appreciate otherwise just the first part is the most important for now.
I have a couple things that needs some doing, but no idea what cost is involved in doing so: (1) My complex unit does not have any neutral wires running through the light switch boxes (I would like to install some smart switches at some point and the best ones all need the neutral wire in the light switch box). There are 10 light switches (5x3 gang, 2x2 gang, 3x1 gang) I need to pull through some neutral wires, and would also like to move the on switch to the other side of the wall. (2) There are 8 wall plugs currently, but I would like to install 8 more (since each bedroom only has 1 and a couple more will be very convenient) and move two of them. I need to repaint and redo the floor in the near-ish future, so opening up the walls and floor is not an issue as long as it will be closed up again after words (3) The DB is from the 70s I think and looks and feels very dated, and although I have a COC that indicates everything is in fine working order, I would like to install/update the board to something newer at some point as well I need a quote for each of the three mentioned jobs to get an idea of what I need to budget or what I can afford currently. I will be keeping an eye on my email for if any further info is required. Thanks in advance
We have had a solar system installed in our club house and require it to be connected to the club house DB board. The club house has never been on municipal power and only had a generator. There would be some additional connections needed such as one of the out buildings to the DB board and the booster pump for the water supply.
1. Gyser is always leaking, leaving a huge puddle outside. 2. Tap thats connected to washing machine doesn't close tightly anymore ... Constantly dripping water .. 3. Bath tap valve thingy broke into half, I tried opening the tap ... I swerved to the hot water direction and tilted the thing up and it came out
Good day Please kindly send me a Quotation for Stripping Office park home to another area and connect everything again. 17 x plugs, lighting system, DB board, 3 X Air conditioning. COC in completion, All faulty plugs, lights, cables and switches will be replaced. After completing reconnection and testing, COC must be issued
Full bathroom renovation for two bathrooms.Bathroom remodel. Remove all old file (wall and floor) and fitting (tub, toilet, basin). Replace with new fittings (walk-in shower, toilet, basin). Remove old floor and wall tiles, toilet, tub, hand basin. Replace with new tiles, walk-in shower, taps, basins etc Bathroom 1 - 22.5m2 , Floor 5m2. Bathroom 2 - 27.5m2 , Floor 7.5m2.
People came and ripped my copper pipes off the wall. I've replaced most of them except my kitchen tap pipes. I'm wanting to change them to polycorp pipes connected to the previous copper pipes that I've replaced. You need 5 corner pipes with piping and a T pipe and 1 galvanized/copper pipe that needs to go through the wall.
Please can I have someone who can assist with: - add more wall sockets in the bedrooms and garage - moving the garage door from the geyser switch on DB board. - sorting out aircon connections (currently connecting through plug point) - outside lights are connected through a plug point - moving the stove main switch Thanks