I need wiring for a entire house. A double storie house with 2 bedroom at the top, 2 bed rooms bottom, 3 bathrooms, a kitchen, dining and lounge. A patio at top and bottom. And a double garage. Kitchen 2 plugs, center table with stove, a plug point require d on the table and walls. Garage DB box and 1 plug, lounge 2 plugs, dining 1 plug, main bedroom 2 plugs, other bedrooms 1 plug, top patio 1 plug. Switches all rooms and patio to the top structure.
20m from manhole to furtherest gulley. Was told sewer has collapsed. Blockage still there. Plumber tried to use drain spring cleaning machine. 20m of mm sewer pipe Three gulley points and three toilet points. To dig new trench possible removal of old sewerpipe or to lay new pipe to manhole.
I need a section of my boundary wall to be scraped to remove the old paint and plaster, then re-plastered, and painted with a matte black paint that can serve as a chalkboard for my kids. The wall measures approximately 6.6 square meters (length: 4.25 meters, width: 1.55 meters). I would like this to be done over the next few of weeks, to be completed by 11 September
Ø PVC Soil and Vent Pipe 6m, Ø 50 PVC Soil and Vent Pipe 6m, x 55 x 95° PVC CE Anti-Syphon Horn Bend, x 50 PVC Eccentric Reducer, x 50 x 95° PVC PL Junction, x 95° PVC CE Junction, Ø PVC Holderbat, 50 x 95° PVC PL Junction, 50 x 95° PVC CE Junction, 50 x 95° PVC PL Bend, 50 x 95° PVC CE Bend, 50 x ° Bend, Ø 50 PVC Holderbat and PVC lubricant Soft
- Location: [ office building, residential complex, schools.] - Area to be painted: - Walls (interior and/or exterior) - Ceilings - Trim (baseboards, moldings, door frames) - Doors - Windows - Stairwells (if applicable) - Surface types: - Drywall - Wood - Metal - Plaster - Number of coats: - Primer (if necessary) - 2-3 coats of paint (depending on color change and surface condition) - Color scheme: - Main color(s) - Accent color(s) - Trim color(s) *Services Included:* - Preparation: - Cleaning surfaces (power washing, scrubbing, etc.) - Filling holes and cracks with spackling compound - Sanding rough areas to smooth finish - Removing old paint, wallpaper, and border (if necessary) - Taping off trim, baseboards, and moldings - Painting: - Applying primer (if necessary) with roller or brush - Applying paint with high-quality brushes, rollers, and sprayers - Cutting in around edges, trim, and moldings with brush - Rolling ceilings and large areas with extension pole - Finishing: - Touching up mistakes and spills - Cleaning up drips and runs - Removing tape and protective gear - Disposing of waste materials *Materials:* - High-quality paint ( specify brand and type: latex, oil-based, etc.) - Primer (if necessary) - Brushes (various sizes and types) - Rollers and extension poles - Sprayers (if necessary) - Drop cloths and protective gear (tarps, plastic sheets, etc.) - Sandpaper and sanding blocks - Spackling compound and joint compound - Tape and masking materials *Timeline:* - Start date: we start on the day of commences - Completion date: we comply with the date of completion - Working hours: 8am-4pm, Monday-Friday] *Additional Requirements:* - Working around furniture and fixtures (if not removed) - Protecting floors and surfaces with drop cloths and plastic sheets - Ensuring adequate ventilation and lighting - Complying with safety regulations and standards
Need to re wire 2 bedrooms, Launch, kitchen & Bathroom with 2 outside rooms, Bathroom & Garage. The house was an one room RDP house & it eas extended in . Ever since it was extended, electricity appliences,TV, four & Two plates stoves, fridge lights are getting damaged..In the Plasma TV & Dstv decoder where strucl by lighting & our is the only house that was struck by lighting that day. Our phone chargers & laptop chargers dont last. We are constantly repairing our electrical appliences because they aleays get burned.
When switching the geyser on it trap mainshwitch ( electricity)
I would like to have the faucets in my bathroom replaced. Currently they are two separate faucets. I am flexible to keeping them separate or combining them into one. I do not have the parts myself and would like to be advised whether the faucets can be prov8ded or if I should get them myself for installation.
The dwelling consists partly of the original timber framed & clad unit possibly constructed years ago plus 's extensions providing two enlarged bathroom, two additional bedrooms and kitchen. The existing legacy installation requires to be tested for safety/compliance. Earth resistance of a socket outlet circuit in the original timber frame & clad building is unacceptably high. Installation consists largely of conductors in steel conduit which is employed as the earth return. Some wiring consists of twin & earth cable possibly installed during the 's. The dwelling consists of lounge/dining room, three bedrooms, kitchen, bathroom, shower room & garage where a more recent DB has been installed. The property is rented to tenants.