Hi I please need quotes on rewiring a 3 bedroom house and getting the db board up to code. The house was ransacked years ago and not only was the electricity meter stolen, but a lot of the wiring also. The house however is still connected to the electricity grid, but is apparently not up to standard in order to have a new meter installed. Thanks
I have old metal gates that my late dad put in years ago. I had palisades put in to heighten the walls, to make the property more secure. Now I need the gates heightened by joining them to a metal base that must be made. I will accept advice on best method and materials to use. I also want to convert these gates from swing gates to folding sliding gates placed onto a metal rail. I attach a rough schematic. I attach pictures taken of the palisade installation. It can be see that the gates need a base to be made to heighten per schematic attached. Please advise.
We have a very old 3 bedroom house that has not been lived in for 40 years. It's a square meter house. The house's electricity runs off a super old diesel generator. We basically want the entire house's electrical to be redone and then put it onto solar power and off grid. Send me a WhatsApp and I can send photos and videos.
We have sold our property at Louisvale dorp. We have a valid COC, but afterwards, the buyer saw things he does not feel comfortable, request a new COC. We need urgently someone to go and have a look at all things on the current COC, and release a new one. It's very urgent and I will appreciate feedback as soon as possible, thank you.
We want to extend an existing 3 phase connection with about 15 meters (and drill through 3 walls). We need to connect 3 normal ovens and stove top units (probably about 8kw) + 1 deck oven ( like this: https://www.absolutecateringequipment.co.za/product/single-deck-oven/) to this three-phase connection (in a separate circuit box). If we can add a meter to measure what is being used in this three-phase extension (in that circuit box), this would be good. We also need to know if this extension might require a higher amps circuit breaker on the existing connection.
Need pricing on a full house rewiring. Square meters is m² x two floors. Double storey house that has been vandalized. Need pricing on the following items: Single plug point Double plug point Light point Downlight point Wiring per square meter DB point Aircon point Geyser point Stove point Outside plug point Gate motor point Outside light point Outside wiring per square meter
I would Like a quote to supply and install a 3 KW inverter with Battery Back Up, Lithium-ion or battery bank capable of supplying power for 4 Hrs, the equipment I have is a fridge microwave two desktop computers a server box and Printer I have had countless hours of additional power outages beyond Eskom Load shedding. the inverter would be Mounted next to the DB as well as the Battery Bank would also require a COC for the Works regards
Please see attached pics, we are wanting to also pop rivet a sheet of rubber against the gate as this gate is in the middle of our son's cricket net, we are busy building and worried about the noise and damage. I need the gate installed, a new gate and if you could do the sheeting then it's a bonus but we can also purchase this and install it ourselves, just want to make sure what ever is quoted that it is possible to do.
install 9 double plug points chasing has been done, we will supply plugs, install 4 light switch points, most wiring is done new outdoor double plug we will supply 3 ceiling fans with remote control in existing lights 2 new single plugs in kitchen for extractor fan and ignition on gas oven, chasing done, we will supply plugs new junction box in bedroom ceiling some extras this job is very urgent as we were let down
We need advice on what needs to be done to obtain a COC. It is a farm / rural/ setting. We then need a COC to be issued when compliant as well, We were also advised to rather remove unnecessary items like pumps for water fountains, "pretty stoep lights" and self installed leads etc. The are three Eskom low amp boxes on the property that feeds each building