Great engagement sticks to promises etc great service.
Happy
Services: Solar panels, Solar energy, Photovoltaic, Solar panels installation
install 9 double plug points chasing has been done, we will supply plugs, install 4 light switch points, most wiring is done new outdoor double plug we will supply 3 ceiling fans with remote control in existing lights 2 new single plugs in kitchen for extractor fan and ignition on gas oven, chasing done, we will supply plugs new junction box in bedroom ceiling some extras this job is very urgent as we were let down
We need advice on what needs to be done to obtain a COC. It is a farm / rural/ setting. We then need a COC to be issued when compliant as well, We were also advised to rather remove unnecessary items like pumps for water fountains, "pretty stoep lights" and self installed leads etc. The are three Eskom low amp boxes on the property that feeds each building
Good day Sir / Madam I trust this email finds you well. We are kindly requesting you guys come and do a site inspection at 90 Bekker Road, Vorna Valley Building A, Hertford Office Park, Midrand ( Do advise when you can come through) on the following request, • 5 Red plugs with 5 external multiplugs • The plugs must be round on the LIVE POINT ( not a half hole please ) • The plugs will be mounted on the poles and external multiplugs can be connected externally there ( picture attached ) The quote must include the following: • Labour rates ( For after-hours) • Show us a consumable explanation of the reg plugs in terms of power usage • installation costs (Including Cabling on walls and desk to the Genset)
I have 8 x Qcell watt panels that I need installed on my tiled roof north facing All installation materials are needed as well as cabling to take the 96volt 40 amp feeds from the roof through to my garage. Need costs for roof install Need costs for cabling install Need costs for isolation / fusing box install Regards
We have a challenge rolling blackouts all the time in Fort Beaufort. I need single phase Solar installation that can supply the house with at least 40A in times when they is a grid failure and batteries that can be charge from the grid as well as from PV The batteries must be able to supply the power for at least 10 hours.
It is a double story renovation from rental to a bed and breakfast. There is four to 5 plugs per room, every room has an en-suite bath/shower. It is 11 bedrooms, kitchen, dining area, Reception area, 2x linen rooms, each floor has its own DB, earthing required, outside lights working with a day/night switch, 2x geysers, 1 stove
We need proposals to install a Solar power generation plant: • 20 Mva. to run the whole mine • 6 Mva. to run the certain sections during load curtailment only This will cover. • Main plant • Circuit D • TSF • Vertical shaft • Underground • Compressors • Surface infrastructure Scope. • Design • Supply • Install • Maintain Please include options like below • Hire to own. • Outright purchase • Power supply only, pay for power used, (no CAPEX) • Rental • SLA on all options
I trust you are well. Please could you quote me on the following. I would like to minimize cost as much as possible. Solar hybrid inverter. Would assume 5kva Solar panels. Would assume 6 panels Lithium batteries. Would assume 2 batteries Installation. I'm looking to be able to have Solar power available throughout the night and recharge and run during the day. I would like to be able to at least utilize a airconditioner and an airfryer as well for a short duration. I would probably need to look at a separate Solar geyser. This is for one person in a simplex. The issue is that sometimes power can be out for over 12 hours at a time and out for extended periods of time as well, so really just need to be covered for these periods.
I want a quote for at 5kw solar system, I need to power a double door fridge/freezer, 2 PC's, one vinyl cutter, 2 3D printers, a few lights and at times one or two household appliances, I need to use the TV and TV box at night, these will not all be used at the same time, I want to be as independent from the pathetic Eskom grid as possible, I have a generator but its not feasible to run currently as fuel is too expensive, the deal will be cash
We have a building that is accommodation for about 8 tenants. We are in need of an electrical COC for the building and for someone to ensure that the building is compliant. Every room (8 rooms) has its own DP box and we need to know how the charges will work - per room or one final cost. This is a bit of an emergency and we are looking to have someone come in tomorrow.