I am replacing two toilets and one bathroom basin cupboard. So three replacements in total. All the items are already purchased. In other words, I have the two toilets with their mechanisms, toilet wax, and seats, as well as the bathroom basin and cupboard with the easy trap waste trap. Note, that I do not have cement for the toilets.
rewire a Relief Home with a total of sqm (25 single plug points; 15 dounble plug points; 15 single light swithes; 6 double light swithes; 4 2way light switches; complete rewiring of a DB - 3Phase and N with 3-circuits and 3-earthleakages. Three(3) 20l Heatech geysers with Solar Intelligent Controllers each (SRC8/SRC9)
Please reach out to me via email. We need a COC as we are selling our property. It is a 3 bedroom (each with 1 plug and 1 light), 2 bathroom home (each 1 lught noplugs) , open plan kitchen( 2 lights, 1 extractor fan, gas stove, no oven, DB board, 3 plugs) / lounge (2 lights, 3 plugs), hallway (1 light no plugs) with a granny flat with 1 bedroom (1 light, 2 pkugs), 1 bathroom (1 light, 1 plug) open plan kitchen / dining room( no oven nor stove, 3 plugs, 2 lights), 1 garage with only 1 plug and 1 light. 1 store room with 1 plug and 1 light. Indoor braai with 3 lights and 2 plugs.
I have a light in one of the bedrooms, where the dimmer is broken. I have had electricians come in, spend 3 hours, charge me tons of money, they have replaced the dimmer, and yet the problem persists. please could you come have a look and see if you can find the fault? I also have a fountain, where the fountain mechanism has been broken. If you could have a look and see if you can fix it.
Hi, I need an Electrical C of C for my flat in Margate (Stralenberg block of flats). The bedroom plugs are not working, thus that must be fixed as well. The geyser was installed new approx. 3 months back and I have a C of C for the geyser installation. Let me know if you can support and by when you can support to give me the quotes? I am available on Whatsapp and email. Thank you
Good day, I need an urgent quote on the repair of a gate and electrical fence. We had an accident on Friday where someone hit the gate with a vehicle. Please find photos attached: The gate is off its socket and has a dint in, The access area is also broken so needs welding, One of the wires of the electrical fence is also ripped out and the gate cannot currently open with the remote. We also cannot put the fencing on. The physical address is: 23b Impala Street, Onverwaght, Lepalale I need someone to assess and quote at the address today after 14:00. Thanks,
Good day Hope you are well.. I have a project of about 10 rental units that are going to need basic electrical installation for all rooms and building . I would like to receive a quotation according to the building plan as it is. i will attached the building plan layout for a more specific quote. Thank you
I will like to know, I have a 2-bedroom property in Midrand and I currently am using about R a day on electricity tokens, which I was told is a lot, below is the items that is in the house. My meter box is a Hexinga. I bought the house and that’s the box that was there. I have a gas stove so no power from there is being used, the geyser is on, the TV’s are on but not through out the day and lights, fridge is on, but that’s about it and we 3 in the property and still the usage is high. Is it possible to do a check and what will be the charge
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.