Everything is fine. The project took a bit longer than expected but that is how building works so there's no problem. Everything went smoothly though as a whole.
Thanks John
Thanks for your support.
Price was excellent
A job which was meant to take 2 days ended up taking 3 weeks.
Services: Electrical contractors, Property maintenance, Wood carport, Waterproofing companies, Roof insulation, Builders, Paving contractors, Wire mesh fence, Carpet, Roofing, uPVC windows, Exterior painting, Wooden windows, Glass doors, Pool fence, Electricians, Shade cloth carport, Thatched roof, Windows professionals, Roofing contractors, Driveway paving, Flooring, Concrete fence, Roof inspection, Shade net carport, Steel windows, Cantilever carport, Basement waterproofing, Block paving, Painters, Fences
The basement is humid and is smelling musty, the walls are flaking in one of the rooms. In winter, cold air seeps through into the ground floor because of the wooden flooring and the spacing between the floor boards. I want a cost effective, economical and durable solution like a fibre seal for walls and underflooring.
Plans were submitted and approved. An engineer has been appointed. Want to remodel (break down 2 walls and refurbish existing bathroom) sub economic house and add an upper level consisting of a bathroom, 2 bedrooms and a pyjama lounge. The plan is to use nutec/timber on the upper level and a conservatory on the ground floor level. Please see attached plan.
Need a double door opening to outside. Currently there is a wood and glass door and frame in the position, would like it replaces with aluminium and glass doors and frame. Measurement from where concrete wall meets wooden frame is cm high cm wide. See attached photo. I prefer being contacted via email or Whatsapp
I have an old wooden floor in a room upstairs, for some years it was carpeted and we left it alone because no one was living upstairs. My daughter has now moved into the upstairs room and we need to get the wooden flooring fixed or replaced as it is making quite a noise. The dimensions of the room is roundabout 8x6.
I have a flat concrete slab roof. I need to replace the current torch on as it is leaking when it rains heavily and causing damp through out the building. The roof portion that needs sealing is over sqm, but I don't know the exact number off hand. I will need to go there later or tomorrow and walk off the measurement. I would like this sooner rather than later, but am a little flexible. I attempted a short term fix as I wanted to build on the roof, but it looks like I will have to wait on that now and just repair the roof. See attached pictures.
I wanted to request the advice and a quotation. We have damp coming through the concrete floor, and have been advised that the main problem is that the paving around the house is directing rain water towards the house rather than away from it. We would therefore need to reset the paving and possibly consider other aspects of drainage For your urgent consideration.
We have plans for a multi phase product with various building works needed. Phase 1 - Conversion of double garage into a small flatlet (marked gymnasium on the drawing attached) the drawing only indicates requirements to pass the plans, but we would need all the additionals such as kitchen cupboards, BIC in bedroom and plumbing done (we have our own electrician) Phase 2 - Conversion of outbuilding into small bachelor pad (marked storeroom conversion on the drawings). here it would be the same as per the Garage conversion with less tilework but all the Sanware and plumbing included. The plans for this section will likely change a bit, but the general idea is indicated on the drawings. Phase 3 - Newly Built staff quarters. This will be a complete build from foundation to roofing. Due to the slant of the property the unit will likely be build on a platform or dug out to level the ground for building works. Phase 4 - Yard work. there is a tar driveway that needs to be extended into the property with parking bays. there is also 2 precast concrete walls to put up (10m and 18m approximately) as well as an existing parking bay needing renovation. Please could you be so kind as to provide estimates and quotes divided into the phases of the project so we can make decisions on the order of the phases based on cashflow and budgets.
I want to give my deck area a shade net carport. I have approved plans for the shadeport but the other materials are too expensive. I need advise on this as well as a site visit and comprehensive quote. The size of the area is 45sqm, the shadeport is for shading of a deck area. The deck is a L shape. Saffraansingel 19, REEBOK
Repair - maintenance. Roof room was built 30 years ago by Adrian Greylling and is generally in very good condition . We have been very happy with room. However the outer layer of the sheets of wooden material used for the walls, is crumbling in small sections - facing into the weather Would like to assess repair before Cape winter
Additional 3 bedroom on the double garage side. Double garage is 6× 6.5m extend for bedroom of 3.6×3.6 & bathroom with wardrobe of 4.5×2.2. On the floor will be a main en-suite plus open kitchen living room area plus a guest toilet 2×3m. Then upstairs will be a 2 bedroom each 4×5m Sharing a full bathroom of 3×3.5 and extra toilet of 2×3 & the extra 2×3m space will be for entrance upstairs.