3 Bedroom House + 3 x Single Bedroom Flats Exterior - Walkway and Foundation cracks - assessment needed - Gutters - Leaking connectors and joints - inspect possible ingress of water into soffets - Gutter spouts to be lengthened to at least mm away from walls - Timber carport needs to be assessed - possible repair or replace - Beams and shadecloth in poor condition - facia boards damaged - Perimeter walls have moisture damage and cracks at the construction joins - Weep holes needed - previously poor quality paint was used - one wall has a severe crack in it, could be sue to a palm tree close by, needs to be assessed for repair or replacement. - tiled patio at one flat is cracked and seems to be sagging - this needs assessment Interior: - Louvre window mechanism replacement / repair -flat 1 - ceilings need assesment as there are bulges - also traces of algae - Shower leakage - flat 3 - caused damage to wall and cupboards - Shower door seal - main house - DB board not compliant with regulations - flat 1 - timber windows needs assessment as some are in poor coniditon - timber garage doors need panels replaced or repaired
Nothing
I need to replace the existing hand basin and toilet. I would like to buy the items from the likes of Chamberlains - with the guidance of a handyman to ensure that I buy the correct stuff. Then the work needed is the removal of the basin and toilet and the new ones installed. I need to know if this can be done with little or no damage to the existing wall and floor tiles. Many thanks .
Good day, I just want my kitchen cupboards to be re-painted please - 19 doors and 4 drawers
Extend current Balcony to be a sun room with lots of aluminium windows and roof
I require a carpenter to build cupboards in two of the bed rooms against the walls. And build simple head boards The exiting bathroom has 4 walks we need to add Please sms or call wash hand basin a shower cubicle and a toilet please call or SMS That’s about it It’s easier to meet on site and discuss If you give me advance notice I can ve in CT to meet and discuss
1. Removal of existing wall & floor tiles 80m2 2. Removal of existing basin,and pan & cistern x2 3. Supply and fit new close couple pan & cistern x2 complete 4. Supply and fit vanity x1 complete 5.Supply and tile subway tile on toilet walls and vanity splash back 15m2 6. Supply and fit sliding hollow hard board door x1 7. Supply and fit kitchen B.I.C complete as discusses with white super gloss finish 8.Removal of all building rubble Separate quote for painting required
maintenance. wall has been painted. cover holes after pulling out nails and then paint corner to corner.