How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
Painting of lounge and 3 bedrooms Plastering external wall Painting external walls whole house Replace bricks with glass bricks 2m x0,5m Building stoeps around the house to block water damage Erect veranda front and back of house Helps with water drainage systems
Looking for somebody to build a fire pit / bouma custom made? Like the one attached. 1.5 x 1.5 and mm from ground.
I am planning on building a six bedroom home, I already have the house plans and can send them upon request.
Remodel of 6 sqm bathroom; shower, toilet, sink with vanity and mirror plus tiling.
2 bedrooms, bathroom open plan kitchen and garage
3 bed, two bath, open plan dining lounge, patio, double garage, pool.