Please Whatsapp me. I have provided all the necessary details, I am not comfortable with scheduling site visits at this point. Looking for a rough figure to work with for the details provided. Roof needs to be pressure washed and painted. Some cracks by the windows. Crack all around the diddle of the double story house so it will need a v joint. Painting of the exterior of the house. House size m² garage has its own roof.
Roof K/Side 98m squared Roof K/Side m squared Eavs K/Side 25,2 m squared Eavs F/side Running/m Eavs Elevation side Eavs Driveway side 23m squared Driveway Elevation 26m squared Back Elevation 14m squared Front Elevation 14m squared Kitchen Side Elevation 14m squared B/walls 9m squared B/Walls 9m squared B/Walls 9m squared
I have a 3 bedroom home, I need to tear down some wall to make a "big one main bedroom". I need to tear some wall to use glass brick to bring in some light. I need to redo my bathroom and pipe line system not good for sewer , possibly outside toilet build + shower, I need to finish off the garage ceiling fell- off. I have to submit quotes to my bank for Financing
(1) My garage is attached to the property and i want to install a door between the property and garage. (2) The back of the garage has a single door leading to garden, i want to enlarge (Break out a section) of the door to install a sliding door Please communicate via email or Whatsapp Chat. Thankyou
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
1.We have existing wood back door with window panel. 2. We have a 2 door with small glass panels. 3. Bedroom window to convert to sliding door. And window panel on 1 of 2 sides. Want to replace all with aluminium or upvc. It also needs to have a mesh door to keep flies, mozzies, cockroaches oout. I would like a golden bronzy colour. Or white. And it must have a guarentee and not be easy to break into. I believe this is a weakness of aluminium doors and windows. And all 3 must have a trellidoor or equivalent in same colour with a rust free guarentee.
i HAVE MOVED OUT OF A TOWNHOUSE AND REQUIRE CERTAIN ROOMS (not all rooms) TO BE PAINTED OR RESTORED back to the condition when I originally moved in. I will need certain picture hook holes patched, and any nicks on the walls patched as well. The ceilings do not have to be painted, This is interior painting only. There may be one cabinet door in the kitchen that will need to be painted as well.
I bought a townhouse in a complex and there are two bathrooms and the kitchen to be renovated. I want the tiling, taps etc. to be removed completely and replaced with whole new designs, this will be for the bathrooms and kitchen. I will then finally need the entire inside of the house to be painted. I am not sure at all about the total sqm of the house. Would need someone to advise.
Seeking a comprehensive renovation project, including: Kitchen Renovation: Full remodel to modernize and enhance functionality. Bathroom Updates: Overhaul of existing full bathroom, redo of the guest bathroom. En-Suites: Addition of en-suites to both master and guest bedrooms. Open Concept: Exploring options to open up living spaces for a more interconnected feel. Potential Extension: Considering an extension at the back of the house.
Labour only: BATHROOM 1: 0,8 x 2,6m Drywall walls and cement floor - all plumbing already done. Build shower wall and floor (1 brick high) Install sink Install toilet Paint sealer over drywall Conceal 40mm waste pipe along wall Tile floor and walls (2,5 high) Install brandering, new ceiling and cornice Fit light Toilet: 0,8 x 1,8m Tile floor Sand and paint burglar bars Install cornice Bathroom 2 : 2,6 x 1,7m Re-do everything, currently tiled Remove all fixtures and fittings Install new sink and cabinet Install new bath Install new shower Tile floor and walls Sand and paint bathroom cabinet and burglar bars Install cornice (ceiling already done) Install 4mm nutec board on existing walls Kitchen: 2,6 x 4,5m Remove all cabinets Remove floor tiles Tile floor Tile walls above new counters +/- 0,5m high Remove 2m asbestos wall Sand and paint burglar bars Outside Install IBR sink on existing carport 8 x 3m Install barge board on roof +/- 20m