I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
This is home which we are purchasing. We intend to install solar once the bond is registered (we plan on doing the installation early in January). We do not currently have electricity usage, as this is a bigger home than we are used to. We would like an 8kW inverter, even if solar panels and battery are smaller, to allow us to upgrade if needed without installing a new inverter. A few options, ranging from R -R would be great
Dear Sirs, Please provide a quote on Labour Rates for the following works on a refurbishment contract project. Removal of Old Reticulation Lines Installation of New Internal Reticulation Lines Installation of 1st Fix, 2nd Fix New Shower Lines New Toilets New Vanities Kitchen Sink Hydroboils Gesyers New Drainage Regards
Please contact me asap. I require the following. 1-off 8kw Sunsynk Inverter, 2×5kw Sunsynk Lithium batteries, 8 × watt mono crystal Canadian or JA Solar Panels. DC Connection/Protection box, AC Sub DB, Surge Pro, Changeo er, Indicators, DC DB, Combiner 3-1. Alternative quotation required for the above but Victron product and Lithium (LiFePO4) Batteries. Need a CoC as well.
Household use: Main use (Eskom to stay connected in case of unforeseen failure of Solar energy supply system) : 1. To run all household appliances and lights 1.1 geyser ( litre) 1.2 electric stove (big) 1.3 two(2) big fridges and 1 medium freezer 1.4 fourteen (14) 30w flood lights 1.5 ten(10) 15w lights 1.6 thirty(30) down lights 1.7 six(6) fluorescent lights NB. The whole house must run on Solar System 24/7. However the Solar System must be connected to the Eskom grid and if for some reason the Solar System experiences some immediate failure Eskom to automatically kick in without any disruption. System should be built on a free standing structure, exclusively built for the Solar System panels.
4 bedroom house All lights in the house..small ceiling down lights. Roof fans in bedrooms/kitchen/lounge/dining room. Electric stove and oven Hairdryer Three television sets DSTV Wifi Washing machine Dishwasher Geyzer(read note at bottom for Geyzer) 2 seperate motorised doors for garage Motorised garden gate Outside ironing room/iron /lights Swimming pool and pump Outside lights Please quote on solar system I will need for the above. I also want solar panels. I do have a solar panel on roof for my geyser. But geyser still gets heated with electricity as well. Thankyou.
I have a two bedroom 2 bathroom plus an office and would like to have a solar system to run my whole house. Washing machine, dishwasher, dryer (if possible), fridge, freezer, air conditioner, lights, tv, internet, computer. Double garage doors. I have no idea what size unit I would need to run so would appreciate your advice and input. Thank you.
I have a 5kw inverter installed and I am very happy with it. However, I wanted to set up SOLAR PANELS but the area is not suitable for panels. I would have to have something portable. The other draw back, I was told to install 4 panels for charging the battery!!! I have a thatch roof. Any advice would be appreciated. I am in Naboomspruit, 2 hours north of Pretoria.
My house has new system installed last week 22 x W jinko panels, installed on roof in 2 groups of 11 connected in series. 1 x 12KW Deye Inverter 4 x lifepro 48V lithium.batteries Whole house isconnected Problems 1. Solar Panels drops ppwee generagikn by 12pm, from.morning to 12pm production is around 6 to 7Kw but bt 12pm it drops till sunset, i suspect some panels are not connected 2. The ppl who installed they seem not gkued up with deye invertee settings, i sispect the settings are wrong also on the inverter I need an expect who can , trace panel per panel connection and set the inverter witj this CT coil This system is new was installed last week
I am having fully installed solar power system which worked for roughly 6 months and the battery keeps on tripping on its Circuit breaker. The installer informed me that it is over discharged. He took it and recharged it and only worked for one day and it is still doing the same thing. I am using this to run 5×4m freezer room. I am told is a 9kw solar power system. It never worked for the entire year and I don't see the benefit of having it. Please come to assess and give recommendations.