Senior Phase LED Lights: 39 maintenance; 8 new installations 6 Bulbs removal and replacement 13 Disco-light bulbs replacement 1 Floodlight installation 2 Garden pole lamps replacement Foundation Phase LED Lights: 13 replacement; 2 new installation 3 Floodlights installation 1 New plug point 2 repositioning of existing lights I also need a COC
Wiring of a section of a house. The section will have 2 DB's, 2 geysers, a kitchen, 3 bedrooms all with en-suites, 6 other rooms. There rest of the house will be done at a later stage. Please provide material with labor quote and labor only quote. Please include the price for chasing of wall and conduit installation.
Good day, We had the house inspected for the purpose of obtaining the compliance certificate and the following defects were noted. Kindly a quote for the following repairs: • Main DB: all C/B not legible to be replaced • Stove: isolator to be replaced • Cooker plug to be rectified • Kitchen: plug to be rectified • Kitchen: 2nd plug to be replaced • Kitchen: open wires to be rectified • Kitchen: light to be replaced • Kitchen: switch to be replaced • Bedroom 1: plug to be replaced • Bedroom 1: to remove cable ties from plug • Bedroom 1: light to be replaced • Flat: 2x light to be replaced • Flat: switch to be replaced • Lounge: plug to be replaced • Lounge: plug no power to be rectified • Only Wiring to light to fit light fitting • Lounge: switch to be down graded to code • Back of house: light to be replaced • Bedroom 2: light to be replaced • Bedroom 2: switch to be rectified & to fit missing gland • Bedroom 2: plug to be replaced • PLEASE NOTE: ROOF SPACE HAS NO TRAP DOOR • ALL EARTHING TO BE RECTIFIED AS PER CODE. Regards,
Good day, We had the house inspected for the purpose of obtaining the compliance certificate. The following defects were noted. Kindly provide us with a quote for the below repairs: • Main DB: all C/B not legible to be replaced • Stove: isolator to be replaced • Cooker plug to be rectified • Kitchen: plug to be rectified • Kitchen: 2nd plug to be replaced • Kitchen: open wires to be rectified • Kitchen: light to be replaced • Kitchen: switch to be replaced • Bedroom 1: plug to be replaced • Bedroom 1: to remove cable ties from plug • Bedroom 1: light to be replaced • Flat: 2x light to be replaced • Flat: switch to be replaced • Lounge: plug to be replaced • Lounge: plug no power to be rectified • Only Wiring to light to fit light fitting • Lounge: switch to be down graded to code • Back of house: light to be replaced • Bedroom 2: light to be replaced • Bedroom 2: switch to be rectified & to fit missing gland • Bedroom 2: plug to be replaced • PLEASE NOTE: ROOF SPACE HAS NO TRAP DOOR • ALL EARTHING TO BE RECTIFIED AS PER CODE. Regards
I have a couple things that needs some doing, but no idea what cost is involved in doing so: (1) My complex unit does not have any neutral wires running through the light switch boxes (I would like to install some smart switches at some point and the best ones all need the neutral wire in the light switch box). There are 10 light switches (5x3 gang, 2x2 gang, 3x1 gang) I need to pull through some neutral wires, and would also like to move the on switch to the other side of the wall. (2) There are 8 wall plugs currently, but I would like to install 8 more (since each bedroom only has 1 and a couple more will be very convenient) and move two of them. I need to repaint and redo the floor in the near-ish future, so opening up the walls and floor is not an issue as long as it will be closed up again after words (3) The DB is from the 70s I think and looks and feels very dated, and although I have a COC that indicates everything is in fine working order, I would like to install/update the board to something newer at some point as well I need a quote for each of the three mentioned jobs to get an idea of what I need to budget or what I can afford currently. I will be keeping an eye on my email for if any further info is required. Thanks in advance
We have had a solar system installed in our club house and require it to be connected to the club house DB board. The club house has never been on municipal power and only had a generator. There would be some additional connections needed such as one of the out buildings to the DB board and the booster pump for the water supply.
Good day Please kindly send me a Quotation for Stripping Office park home to another area and connect everything again. 17 x plugs, lighting system, DB board, 3 X Air conditioning. COC in completion, All faulty plugs, lights, cables and switches will be replaced. After completing reconnection and testing, COC must be issued
16th birthday, girls, 'something fun to do' - with photo opportunities. We liked the Franschhoek train, but obviously useless without wine tasting for the age group! Shuttle bus, hop on hop off, but going where? Outdoors is tricky, considering winter rains, but so fun Also considered Grand Daddy trailers and movies, but it gets a lot of fuss for an overnighter, would have to be fewer guests Even considered high tea at Mount Nelson with day room for primping and photos in the garden, way out of our league We prefer interactive, not just restaurant gathering The idea is something different, togetherness, memorable 16th, number of guests would depend on The Plan Ideas, please
Please can I have someone who can assist with: - add more wall sockets in the bedrooms and garage - moving the garage door from the geyser switch on DB board. - sorting out aircon connections (currently connecting through plug point) - outside lights are connected through a plug point - moving the stove main switch Thanks
Please give me an indication of your rate per hour and the amount of hours it will take to do the following: Change 1 normal light to an LED floodlight Install one extra LED floodlight 5 meters from the above mentioned light Install a day night switch for the above two lights Install a new LED pool light in the old pool light bracket. Install a day-night switch for the above pool light Please do not include any supplies in the above labour charge, as I just want an indication of the expected time to install the above as well as the rate per hour. :-) I would like to be contacted via email please.