1. Remove broken toilet cisterns in learner - boys (4) and learner - girls (3) toilets. 2. Replacement of cisterns (7 cisterns) with high traffic anti vandalism toilet cistern. 3. Repair broken water pipe under basin in learner (boys) toilets 4. Unblock learner - boys and girls toilets 5. Service flush valve in male staff toilet. 6. Remove old waste at urinal in male staff toilet 7. Replace with new waste (bottle trap and grating
I would like to have a -litre high-pressure solar geyser system with tubes to replace the electrical one. The roof type is high pitch. I do not need the geyser timer because the electric one is already installed. Due to my busy work schedule, you may consider communicating either via email or whattup, if you do not find me on the cell phone.
I am not currently ready for a site visit, would just like an approximate quote for now based on the following information: I would like a quote for consideration on an 8kW Hybrid Inverter System with 10kWh of Battery and 8 by Wp Solar Panels. Roof is tile with a pitch if 15 Deg facing north, cable run 12m. Inverter in garage which is 6 meter from main DB
Existing W 24V pure sine inverter. 2 x W panels. 4x 12 V lead acid batteries. 24v 60A alternator on 10hp diesel motor supplies about W. I need 2 more W panels. Also 2x 3.5kW lithium 24V batteries. Existing 2 panels to be relocated for max perfomance. Sub DB from inverter handles 5 kW per day. I am hoping to sell the propert soon , therefore would not go to big. Would rather go fullhouse on my property in Port Elizabeth.
Whatsapp or email - preferably Whatsapp communication please. To replace faulty and leaking stop cock. This is the main water supply pipe to our unit in a complex. Water supply to complex must be turned off , so that the stop cock can be replaced. I've done renovations to our flat ,and discovered a ancient, faulty stop cock. The stop cock is leaking and is on the main water supply pipe to our unit. We need to replace this faulty stop cock, and fit a new one. The problem is that we need to turn off the water supply to the complex, replace the stop cock, and return the water supply.
intended for use at school of 8 blocks (admin block included), for lights, four printing machines, two photocopy machines, kettle, heaters in classes during winter (can be 8), four refrigerators, five aircons, one geyser. Our school has learners with 40 educators situated at Ext 71 Madiba park in Polokwane.
Toilet is not flushing properly. It only flushes when I open the clean out pipe and let the air out. The last few days even that is not helping to make it flush and the drain fills up. Solids take forever to flush down. Water level in toilet drops and it makes a glugging sound that goes on until I open the clean out pipe.
In a process of applying for finance from Standardbank for solar installation. I need a qoute from an accredited solar installer so I can submit to the bank. The qoute should include everything, equipments, and installation costs and still be connected to the grid just incase. In my house I have outdoor lights, 2 geysers, stove, pool and indoor lights.
We need a Compliance Certificate as we have sold our house. The following repairs need to carried out; -Tighten x2 packing nuts outside. -Replace x1 hand shower rose, (downstairs). -Service shower taps. (ensuite) -Replace x1 hand shower hose swivel. (upstairs bathroom) -Remove and replace 15mm poly cop front of house and court yard. -Add x1 kitchen mixer head part sleeve. -Install R1 lagging on hot water line 3m Install R1 lagging on cold water line 1m Install R1 lagging on tp overflow 1m -Replace 40mm drip tray overflow to 50mm pvc. -Replace 15mm poly cop to 15mm cobra for prv overflow. -Saddle pipes correctly in roof space. NOTE: upstairs bathroom has a mixer that needs replacement. Client has already bought one
We have already dug open the underground sewerage pipe. Roots of a tree grew into old clay type sewerage pipe. We shall also remove the existing sewerage pipe , 5 meter length. We have already bought the new mm underground sewerage pipe ( 6 meter length) as well as the connecter fittings ( mm ) . We have also bought the river sand which should be placed in the trench underneath the new pipe and also on top of the new pipe. Please quote to place the new pipe.