I am replacing two toilets and one bathroom basin cupboard. So three replacements in total. All the items are already purchased. In other words, I have the two toilets with their mechanisms, toilet wax, and seats, as well as the bathroom basin and cupboard with the easy trap waste trap. Note, that I do not have cement for the toilets.
Morning, CBSMS has been appointed by a number of local municipalities to generate income. We would like to request your help with design, equipment, management and funding for: - Cameras - Solar power - Computers - Any revenue generation proposals you may wish to propose? This is for A number of LOCAL / District MUNICIPALITIES, based on a revenue share model. Would you be able to assist? If yes, please do select a suitable date & time for us to discuss how, from: https://meetings.hubspot.com/barry-t-fryer
Repair/replace a litre solar geyser. This litre solar geyser is using geyser wise and currently does not heat the water. The diagnosis given by technician is that the system was damaged by loadshedding. I'm looking at the possibility of converting this geyser to a "solar power only" geyser.
Greetings, require a 5kwh hybrid solar inverter with 5.09kwh lithium battery - mid range- 6 solar panels w each with rails etc, solar cables 10 meters, include required components (MPPT charge controller to be bulit into inverter, switches and surge arrestors and fuses with combiner box ) all other components and about 10 meters of power cabling from main DB Box. Installation on flat torched on - roof - rails secured on wooden beans.
1. What is the basic voltage and frequency use in a) A house B) Office Block C) for farming? 2. Is the above single or 3 Fase module? 3. What is the motor capacity HPR? Kilowatt 4. Do you need a direct variable drive motor eliminating batteries to work only with sunlight? 5. Office needs batteries optional online and offline Eskom and Solar
We are a school called Phendukani Full Service High School in the Madadeni Township. We are looking for solar panels to cover us during load shedding. This can occur for 3-4 hours, generally only once during the school day. A previous quote recommended that we'd need an 8.8kw inverter, a 5.1kw lithium battery, and 12 w solar panels. So we are looking for quotes for systems similar to this. We are happy either to rent for 2-3 years or to buy, and would like quotes for both. Thank you for your time, we look forward to your response.
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
This is home which we are purchasing. We intend to install solar once the bond is registered (we plan on doing the installation early in January). We do not currently have electricity usage, as this is a bigger home than we are used to. We would like an 8kW inverter, even if solar panels and battery are smaller, to allow us to upgrade if needed without installing a new inverter. A few options, ranging from R -R would be great
Dear Sirs, Please provide a quote on Labour Rates for the following works on a refurbishment contract project. Removal of Old Reticulation Lines Installation of New Internal Reticulation Lines Installation of 1st Fix, 2nd Fix New Shower Lines New Toilets New Vanities Kitchen Sink Hydroboils Gesyers New Drainage Regards
Please contact me asap. I require the following. 1-off 8kw Sunsynk Inverter, 2×5kw Sunsynk Lithium batteries, 8 × watt mono crystal Canadian or JA Solar Panels. DC Connection/Protection box, AC Sub DB, Surge Pro, Changeo er, Indicators, DC DB, Combiner 3-1. Alternative quotation required for the above but Victron product and Lithium (LiFePO4) Batteries. Need a CoC as well.