
A small block of flats needs help maintaining the 10 single-car wooden garage doors, including 1 that was recently installed & painted, and 1 that was recently installed but not yet painted. Here is the work that needs to be done: A) 8 older garages - Exteriors need to be sanded, primed (2 layers), and painted white (2 layers). Interiors need to be oiled (silkwood/linseed). B) 1 brand new, unpainted garage - Exterior needs to be primed (2 layers), and painted white (2 layers). Interior doesn't need oiling (was just done). C) 1 recently painted garage - Exterior needs 1 layer paint (to match other whites), but no sanding/priming needed. Interior needs to be oiled (silkwood oil provided by owner). See photos of some of the garages for reference. We'd like a quote for labor, paint, and oil.
2 of 20 liter prime paint. 1 of 20 liter colour paint. For bedrooms. 1. Of 20 liter paint color . For TV room and passage. 10 or 20 liter if it will be affordable in 20 liter. White paint, for kitchen and bathroom ceilling. 5 liter of enamel White paint, for doors. Preferably washable paint.
Years of borehole water has sludge build up and the pipe need to be replaced. The pumphouse is situated between portions 28 and 29. The pipe will need to follow the length of the road to the cul de sac and circle back on the opposite side. Two pipes to be laid. One in use now and the other to be used once the estate has potable water.
Checking of gate garage motor and welding of gate.
Good afternoon. Please may i have a quotation for paving a patio area(not too slippary as it has a jacuzzi in the area). Approximatly 5 square meters. 6.5 Meters X 8.5 Meters The area has been dug up(Grass removed and needs to be compacted as it is loose soil at the moment) Work is for next week(16th-20th December)
We have 2 geysers in home, one in main bedroom and one for rest of house. We need to connect warm water from bedroom to other geyser and be able to use the main bedroom once we have guests, with a stop valve connected to open it when needed. But while power is switched off, it must still circulate cold water for it not to rust while not heating (in use)
My house is running on 3 phase, I bought it like that. My ESKOM account is killing me I need to convert too single phase
1. At midday Monday 16 December a tenant reported a problem with the earth leakage tripping 2. Upon further investigations two circuits on separate breakers (geyser) & (garagre) were isolated to be a problem as they themselves were tripping on the board. 3. The geyser element was checked, found to be in good order but relpaced in attempt to further isolate. 4. It would seem there is a feed back current on the neutral of tere two circuits or breakers.
We have 3 toilets leaking at the back. It look like we need to remove the toilet and put in a new seal because the outside sealing we put does not last. we experiencing a bad smell coming from the drain system.you can smell it in the house. Store bought products does not work for long.it reoccures after few days.