it's a tuckshop attached to a kitchen
Build in three sections. Main Home, section 1; office and guest room, section 2; and Granny Flat, section 3. Want to build Main Home (section 1) now with rest later as funds become available. Need to build within a budget and will have to negotiate with builder what we can do with the funds we have available. Phase 1 plan attached that we need quote on.
Bought a house will receive keys this month maybe next week, need to renovate the house
I'm looking into doing up my garden as I have been neglecting it for quite a while. I am open to suggestions. Im looking for something simple and easy to maintain. I would be open to suggestions on what to do as well.
m2 main building paint ms main building roof painting Second building ms roof m2 walls
I need weeding, cutting lawn, clearing weeds from flower beds, some new flower planting, leaf blowing in driveway, flat roof, carport. I own an acre, mainly need top half maintained with perhaps twice a year slashing on the lower half of my property. There is a fence between the two halves, with a gate.
painting of house, windows . the are 2 cracks on the wall
Plans have ben approved by council. Front Perimeter wall (segmented by "hip high" columns with a 20mm/maybe more brick upstand linking them - wooden slats - picket fence-esk style). This wall will run to the driveway gate Driveway will run the length of the house to the double garage (this will not be shown on the plans but I thought it was worth mentioning) Double Garage (dimensions of 6mx7m length) in the South East corner situated behind the main bedroom's en-suite - Flat roof, same design as the house - it will need to match the same slope etc. Rear perimeter wall (block is indicated on the plans but vibracrete will most likely be used) connecting the garage to our neighbours vibracrete wall Side perimeter wall on neighbour's boundary line (made of block - "hip high" as well approx 1m) running from the garage down the driveway to driveway gate (building line) Deck - If a separate quote could be provided on the building of a staircase leading to the deck as indicated by the plans Driveway - needs to be leveled and paved, separate quote on this can be provided as well Preferable start would be late April, early May