
Urgent: A complex in La Lucia require 7 floodlights to be installed into already existing points (replacing of old floodlights) As part of a Body Corp, We also require the necessary documentation: 1. CIPC registration 2. Letter of good standing - Dept of Labour 3. Confirmation of Banking Details 4. Liability insurance
I already have a 5kva inverter with Lithium batteries installed. Only need solar panels for this. Gas stove and gas geysers already installed
It shakes when it starts but no power and it burns the coil pack
Home rewiring 11 plug points (2 shared points) 11 light fitting 12 switch points
2 bedroom dining room kitchen
Need a small system to just supply my pc, tv and wifi during load shedding for 4 hours
Disconnect one stove and connect a new stove.
Roller garage door came of its guide, railings.
I am looking to have this done next month. Please only contact me telephonically from 1 August. We can then discuss properly. Solar panels, inverter and lithium batteries required for a 4 bedroom house. Geysers NOT to be on system. Normal household appliances to be used - no high draw current required. Preferred system: SunSynk Guarantee required for waterproofing of roof after installation.