How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
50 square meter extension with 2 bedrooms etc
Need a quote on wetworks: To lay mm slab in one of the spaces (30 to 40m2). Once done to screed the entire m2 space and float. Conduit to be installed in the floor to facilitate plug points (can be discussed onsite). To straighten plastering (or remove entirely) plaster on soffit and concrete beams in space. To screed 50mm to 80mm in another vacant 90m2 space and float.
6x3 granny flat with shower toilet washbasin and little kitchen sink with cupboards underneath
Concrete Paving 5m x 5m, 75 mm thick
A DECK WITH 4 ROOMS TOP
We have a boundary wall that collapsed by the swimming pool area and would like to have it put up again.
I need somebody that can do garden cleaning and cutting of grass