Senior Phase LED Lights: 39 maintenance; 8 new installations 6 Bulbs removal and replacement 13 Disco-light bulbs replacement 1 Floodlight installation 2 Garden pole lamps replacement Foundation Phase LED Lights: 13 replacement; 2 new installation 3 Floodlights installation 1 New plug point 2 repositioning of existing lights I also need a COC
Good morning, please can you provide a quote for the following plumbing issue. There is a T junction where the sewer from one toilet runs into the pipe from the main toilet. The T junction is within about 2 metres from the main toilet and 5 metres from the second toilet. There appears to be a broken or damaged pipe in this area and this restriction is creating a blockage. It seems that the T junction will need to be replaced. There is obviously paving that needs to be removed in order to reach this section. We have previously had a plumber in who tried to clear the blockage and gave us the above information. We would like to receive a few quotes before going ahead with the repairs. Thank you. Kind regards
The house to be built is about square meters. I already have the plans but I need your e mail address to forward it to you. The project would be in Hermon, 24 km from Wellington and 30km from Malmesbury. On this plan we need the IBR sheeting to be one whole length sheet of say 1,5 meter wide and 19 meter long. Is such an animal realisable or do I have it miss. work on the complete roofing for this house. Thus kindly send me your e mail and you will then get the plan to compile your quote. Thanks.
Wiring of a section of a house. The section will have 2 DB's, 2 geysers, a kitchen, 3 bedrooms all with en-suites, 6 other rooms. There rest of the house will be done at a later stage. Please provide material with labor quote and labor only quote. Please include the price for chasing of wall and conduit installation.
Good day, We had the house inspected for the purpose of obtaining the compliance certificate and the following defects were noted. Kindly a quote for the following repairs: • Main DB: all C/B not legible to be replaced • Stove: isolator to be replaced • Cooker plug to be rectified • Kitchen: plug to be rectified • Kitchen: 2nd plug to be replaced • Kitchen: open wires to be rectified • Kitchen: light to be replaced • Kitchen: switch to be replaced • Bedroom 1: plug to be replaced • Bedroom 1: to remove cable ties from plug • Bedroom 1: light to be replaced • Flat: 2x light to be replaced • Flat: switch to be replaced • Lounge: plug to be replaced • Lounge: plug no power to be rectified • Only Wiring to light to fit light fitting • Lounge: switch to be down graded to code • Back of house: light to be replaced • Bedroom 2: light to be replaced • Bedroom 2: switch to be rectified & to fit missing gland • Bedroom 2: plug to be replaced • PLEASE NOTE: ROOF SPACE HAS NO TRAP DOOR • ALL EARTHING TO BE RECTIFIED AS PER CODE. Regards,
Good day, We had the house inspected for the purpose of obtaining the compliance certificate. The following defects were noted. Kindly provide us with a quote for the below repairs: • Main DB: all C/B not legible to be replaced • Stove: isolator to be replaced • Cooker plug to be rectified • Kitchen: plug to be rectified • Kitchen: 2nd plug to be replaced • Kitchen: open wires to be rectified • Kitchen: light to be replaced • Kitchen: switch to be replaced • Bedroom 1: plug to be replaced • Bedroom 1: to remove cable ties from plug • Bedroom 1: light to be replaced • Flat: 2x light to be replaced • Flat: switch to be replaced • Lounge: plug to be replaced • Lounge: plug no power to be rectified • Only Wiring to light to fit light fitting • Lounge: switch to be down graded to code • Back of house: light to be replaced • Bedroom 2: light to be replaced • Bedroom 2: switch to be rectified & to fit missing gland • Bedroom 2: plug to be replaced • PLEASE NOTE: ROOF SPACE HAS NO TRAP DOOR • ALL EARTHING TO BE RECTIFIED AS PER CODE. Regards
Require a carport structure to be erected next to a braai room in my backyard. Material (steel sheets, steel lipped channel purlins, steel flashing and steel poles) are on site. The area to be covered is 6.25 x 3.45. The contractor must be able to erect steel carports, have a welder as part of his team and have power tools to cut steel purlins, steel sheet and steel poles. Roof structure requires welding.
I am looking for quotes for splitting the pipework in 6 unit complex so that each unit has its own incoming water supply and install a stop valve per unit. We require this so that we can install prepaid water meter. So if you can offer prepaid water meter as well and make it one inclusive quote , that ill be highly appreciate otherwise just the first part is the most important for now.
This is a new built house . I need designs by the above mentioned things around the house which is in a sloppy place .closer to the wall of the house small paving ,follow by a lawn and then paving that is the back of the house .St the front paving next to the wall,lawn and the flowers after the lawn .
I have a couple things that needs some doing, but no idea what cost is involved in doing so: (1) My complex unit does not have any neutral wires running through the light switch boxes (I would like to install some smart switches at some point and the best ones all need the neutral wire in the light switch box). There are 10 light switches (5x3 gang, 2x2 gang, 3x1 gang) I need to pull through some neutral wires, and would also like to move the on switch to the other side of the wall. (2) There are 8 wall plugs currently, but I would like to install 8 more (since each bedroom only has 1 and a couple more will be very convenient) and move two of them. I need to repaint and redo the floor in the near-ish future, so opening up the walls and floor is not an issue as long as it will be closed up again after words (3) The DB is from the 70s I think and looks and feels very dated, and although I have a COC that indicates everything is in fine working order, I would like to install/update the board to something newer at some point as well I need a quote for each of the three mentioned jobs to get an idea of what I need to budget or what I can afford currently. I will be keeping an eye on my email for if any further info is required. Thanks in advance