I am a professional painter, been in the industry for year's now. We start with preparation, were prepare the wall by first scrapping the Wall's, closing the wall with polyfil, then sand paper then remove dust from the wall after completing closing the cracks and holes, sandpaper and removing the dust we apply our primer after it dries we apply our first coat, if the wall doesn't require second coat we apply our finishing coat
Good day Hope you are well.. I have a project of about 10 rental units that are going to need basic electrical installation for all rooms and building . I would like to receive a quotation according to the building plan as it is. i will attached the building plan layout for a more specific quote. Thank you
Please Whatsapp me. I have provided all the necessary details, I am not comfortable with scheduling site visits at this point. Looking for a rough figure to work with for the details provided. Roof needs to be pressure washed and painted. Some cracks by the windows. Crack all around the diddle of the double story house so it will need a v joint. Painting of the exterior of the house. House size m² garage has its own roof.
I will like to know, I have a 2-bedroom property in Midrand and I currently am using about R a day on electricity tokens, which I was told is a lot, below is the items that is in the house. My meter box is a Hexinga. I bought the house and that’s the box that was there. I have a gas stove so no power from there is being used, the geyser is on, the TV’s are on but not through out the day and lights, fridge is on, but that’s about it and we 3 in the property and still the usage is high. Is it possible to do a check and what will be the charge
Roof K/Side 98m squared Roof K/Side m squared Eavs K/Side 25,2 m squared Eavs F/side Running/m Eavs Elevation side Eavs Driveway side 23m squared Driveway Elevation 26m squared Back Elevation 14m squared Front Elevation 14m squared Kitchen Side Elevation 14m squared B/walls 9m squared B/Walls 9m squared B/Walls 9m squared
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
We require someone to do electrical cable runs under the ground around a property (property size Dual Ducting along route for our fibre line. We will need 3 outdoor plug points in a outdoor enclosure (enclosures to be provided by you) V at all 3 points, including the guards room. We are also looking for someone to lay Fibre with 18 Fibre splicing at each camera post.
i HAVE MOVED OUT OF A TOWNHOUSE AND REQUIRE CERTAIN ROOMS (not all rooms) TO BE PAINTED OR RESTORED back to the condition when I originally moved in. I will need certain picture hook holes patched, and any nicks on the walls patched as well. The ceilings do not have to be painted, This is interior painting only. There may be one cabinet door in the kitchen that will need to be painted as well.
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry