Top service from Ashlen
Services: Solar panels, Solar panels installation, Photovoltaic, Solar energy
This enquiry relates to a single story 3 bedroom house that is nearing the end of renovation and probably be put up for sale in two or three months. As far as I know , a registered electrician has worked on tbe house recently but don't know what was done. However I know that another one has to inspect and advise on any repairs required. I think the house is approx 50yrs old
This is the information in order to determine the system that would suit me and other relevant information that I would require 1. I use an average of 33KWh/day 2. The Fridge, Stove, Geyser, Microwave and Clothing Iron must be excluded, and will continue on municipal power 3. I would like 2 options - Rent, or outright purchase. 4. Guarantee and warrantees included 5. Advise service intervals, cost there-of, and maintenance contract if available. 6. Installation period, lead time, and payment terms.
JOB LIST: Electrical: Main Distribution Board: → Put geyser on earth leakage. → Underrated jumpers to be amended. → Cover to be earthed. → Install fed from label. → Install danger label. Bedroom: → Secure loose plug. Patio: → Replace broken round outside light fitting. Geyser: → Label isolator. → Issue certificate.
Hi there, We're buying a house in Faerie Glen PTA and are challenging the electrical compliance. We need a quote for the work needed to bring the property to compliance, plus potentially a few additional fixes, plus issue of new electrical certificate. Could you please let me know if you are interested in quoting?
Just adding 4 more W panels to tile rooftop in parallel to the existing panels. Existing deye 8kW inverter Already have 4 panels 2 schletter rails and clips, 2 x MC4's, 4mm solar red wire 25m and 11m black wire (black is probably 5m too short to complete installation back to inverter, but got 5m red?) Just require roof brackets and installation with COC.
Please reach out to me via email. We need a COC as we are selling our property. It is a 3 bedroom (each with 1 plug and 1 light), 2 bathroom home (each 1 lught noplugs) , open plan kitchen( 2 lights, 1 extractor fan, gas stove, no oven, DB board, 3 plugs) / lounge (2 lights, 3 plugs), hallway (1 light no plugs) with a granny flat with 1 bedroom (1 light, 2 pkugs), 1 bathroom (1 light, 1 plug) open plan kitchen / dining room( no oven nor stove, 3 plugs, 2 lights), 1 garage with only 1 plug and 1 light. 1 store room with 1 plug and 1 light. Indoor braai with 3 lights and 2 plugs.
Morning, CBSMS has been appointed by a number of local municipalities to generate income. We would like to request your help with design, equipment, management and funding for: - Cameras - Solar power - Computers - Any revenue generation proposals you may wish to propose? This is for A number of LOCAL / District MUNICIPALITIES, based on a revenue share model. Would you be able to assist? If yes, please do select a suitable date & time for us to discuss how, from: https://meetings.hubspot.com/barry-t-fryer
Hi, I need an Electrical C of C for my flat in Margate (Stralenberg block of flats). The bedroom plugs are not working, thus that must be fixed as well. The geyser was installed new approx. 3 months back and I have a C of C for the geyser installation. Let me know if you can support and by when you can support to give me the quotes? I am available on Whatsapp and email. Thank you
Repair/replace a litre solar geyser. This litre solar geyser is using geyser wise and currently does not heat the water. The diagnosis given by technician is that the system was damaged by loadshedding. I'm looking at the possibility of converting this geyser to a "solar power only" geyser.
Greetings, require a 5kwh hybrid solar inverter with 5.09kwh lithium battery - mid range- 6 solar panels w each with rails etc, solar cables 10 meters, include required components (MPPT charge controller to be bulit into inverter, switches and surge arrestors and fuses with combiner box ) all other components and about 10 meters of power cabling from main DB Box. Installation on flat torched on - roof - rails secured on wooden beans.