Ø PVC Soil and Vent Pipe 6m, Ø 50 PVC Soil and Vent Pipe 6m, x 55 x 95° PVC CE Anti-Syphon Horn Bend, x 50 PVC Eccentric Reducer, x 50 x 95° PVC PL Junction, x 95° PVC CE Junction, Ø PVC Holderbat, 50 x 95° PVC PL Junction, 50 x 95° PVC CE Junction, 50 x 95° PVC PL Bend, 50 x 95° PVC CE Bend, 50 x ° Bend, Ø 50 PVC Holderbat and PVC lubricant Soft
Same color to be used as on walls biscuit color. Around doors and windows 10cm sq. boarder with same color which is charcoal. Only front section of the roof require painting. The use of durable exterior paint must be used. The white nova board under the over hanging roof beneath must also be repainted and where required if the wood has deteriorated be replaced.
We would like to extend an exterior wall (our living room) out by one meter into our yard as it is difficult to arrnage furniture in the small space. The wall is 4meters in length. This means an extension of 4sqm. We would like to complete the project with block and would not mind a flat roof extension (our current roof is pitched).
Midea Under Ceiling Btu/hr (3 Phase) Non-Inverter Air Conditioner Model MUE-60HRN1-R Eco-friendly RA Gas. Attractive design for under ceiling installation or vertically against a wall. 4 models from Btu/h to 60 Btu/hr. Cooling and Heating. Wide angle air flow creates more comfortable air circulation Multi-blade fan and double air guides creates a smoother airflow and less turbulence Piping between outdoor and outdoor can be up to a max. of 50m. For areas up to m². Noise Level: 55dB(A) This unit uses Three Phase power. Enquire about Installation as this is not a standard product. Refer to the brochure for further specification including dimensions. Pictures of outdoor units may differ from actual depending on the model. 12 Month Warranty. Free Delivery Nationwide – South Africa. Excellent value for money!
3 bed, 3 baths, plus guest toilet. Open plan. Vinyl floors. No carpets. We have a robot vacuum that vacuums everyday, so floors are 'clean'. Just needs washing. Every month, one day inside of cabinets to to wiped down, other day fridge inside and kitchen cabinets, another day, moving washing machine, tumble drier to clean behind them, and wiping skirtings, every day cleaning either sliding doors in living area, front door or bedroom windows to break the work up over a month, cleaning twice a week. bedroom to break up the work.
We need to do torch on as in flashing where the horizontal steel roof meets the verticle steel structure using 1metre wide torch on membrane.It has to be installed 40cm on the vertical side and bending it at 90degrees so that it covers 60cm horizontally. So it's 40cm verticle and 60cm horizontally without joining it horizontally where the verticle meets the horizontal, however the membrane might be joined vertically if need be.The distance is 50metres of flashing that needs to be done.( 50m by 1m ).the entire roof is fine . We just need to do flashing using torch on or any rubberising waterproofing that would give better results but NO liquid waterproofing. Kind tegards
We have a three bedroom house with a huge living room and rather small kitchen.we would like to renovate and move the kitchen to another area etc.we would also like to to see if we can add a bathroom in the main bedroom and use some of the bigger space where the living room currently is to add stairs to the top which will lead to a balcony.the balcony must be like a braai area at the bottom or a relaxation or entertainment area
The main large items are 2 X sofas, 2 X fridge, 1 X Bar fridge, 1 X chest freezer, 2 X coffee table, 1 x small desk, 3 X Chest of Drawers, 2 X washing machine, 1 X drier, 1 X tv stand, 4 X beds and mattresses (disassembled) 1 X sewing machine attached to table, 2 x bedroom mirror/vanity, 8 X chairs, 2 x barstools, 1 X foyer stand, Approximately 20 boxes packed and sealed. There are other sundry items of course but these are the main large ones.
Good day, Can you please provide me with pricing for plumbing. The property was vandalized. It is a three bedroom house, with kitchen, 2 bathrooms, 1 scullary and an outside bathroom/toilet and the following had to be done:- Installation of Copper pipes for water system including PVC pipes. Installation of pipes and toilets x 4 and basin's and taps x 3, pipe work to install sink in kitchen and gas geyser just outside kitchen. Link all pipes in the house to council water supply.
I moved out of my house in with my 2 children. My husband had an affair 3 years prior this date. And he is now staying with the same woman. My oldest son from my 1st marriage is gay and my husband chased him from our house. This is the 2 reasons I left. Now I need to start divorce case and I need to know what is my rights in this matter