Separation of my sewerage pipe from the neighbors' sewerage pipe as I always have drain blockage whilst I'm not suppose to because I'm mostly not around and things that comes out from the drain she agrees that are from her side, she's got more than 15 foreign tenants I have none but I'm the one suffering
Toilet-My two toilet are forever dripping water and as such waste a lot of water...Bathtub-The hot water pressure on my bath tub is too small and takes forever...Sink-My two sinks stoppers when pressed down to stop water from escaping the sink could not come back to their original position.Water stays long in my sinks and takes forever to go out. Send me the quotes via email, please. It can be done on Monday also.
Good day, we are waiting to finalize transaction of the old house without any wall. we need a swimming pool, boundary wall, to add bedroom on top for space. we need to add an extra 2bedrooms flat let. the pace is square meters. You can email me. We need also to know who can do the work sooner and to get pay later, how much can the deposit be to start the work. we need to have a quote to know if we can start sooner or later when we have enough.
Hello, we currently have a 3 bedroom house with 1 full bathroom, a lounge + kitchen. I would like to extend into a double story house, with a total of 4 bedrooms 3.5 bathrooms with the (2 bathrooms being ensuite), double garage, a kitchen, a dining area, a lounge, Pajama Lounge. I have attached 2 pictures. 1 being our current house, 2nd picture it's a rough sketch of the new project
Cottage 45,25 Square M - 1 Shower, 1 Basin, 1 Toilet Scullery 9,87 Square M - 1 Double Sink and dishwasher outlet and tap Laundry 7,47 Square M - Washing machine outlet with tap Garage 43,85 Square M - Double Mono pitch roof. Floating foundation, already compacted raised surface, no concrete yet, steel for foundation already on site
Good day The patio and entrance need to be completed, the staircase need attention and frame need to be installed and clading to be done. Fire place need to be finish with litels, bathroom need new plumbing and to be retailed after plumbing is repaired. Kitchen tiles on wall. Hall way to be tiled. House need to be painted inside outside roof and window frames. Driveway need to be change and carport need to be moved to next to house and not in front.
Shop fitting team that can cost on a project. Renovation for a commercial store. The project will shortly go ahead. The team should be able to finish project from start to finish, have contactable references and work references to present. We are looking for a one stop team that is professional and reliable to work with.
Our house has burned down. And we need to rebuild or get alternative housing on the property. We need a 6 bedroom house, with a kitchen and bathroom. No lounge. Bedroom sizes should all be the same 4m X 4m and the 2 bathrooms 2m X 4m and kitchen should be 4m X 10m. Please will you quote me on this.
Dear Sirs As previously advised we wish to constructions an off street parking area at a private home - this will require excavation work of +-- 60sm ( max depth from 1.2 metres graduated down to street level) wall retention, and the construction of a 'T' shaped carport footprint. We also wish to construct a single garage in the driveway. Free quotations will be appreciated. Regards IVOR WALDECK 9 Manson Road, Newlands
Installing electricity from scratch in a 6 roomed house with a toilet( seventh room) The dB will be in a kitchen. The lounge will have 2 plug points and 1 double switch, the kitchen will have 3 plug points and 1 double switch. The main bedroom will have 2 plug points and I switch. The second bedroom will have 1 plug point and 1 switch. Third bedroom will as well have 1 plug point and 1 switch. The fourth will have 1 plug point and 1 switch. The lounge will have 5 dull lights. The kitchen will have 6 dull lights. Other rooms will have each normal lights.