I already have a clearview fence installed and I am looking for a barbed razor wire fence for the top of the clearview fence. I have an approximate length but I am not percent sure if that length is correct. This is quite urgent as I am looking for the fence to be installed by the end of this month.
I have install a solar system and wiring and solar panels was installed by guys that have solar installation experience, but did it privately. Kodak 5kw off grid inverter mks iii, 12 x watt Longi panels and all wires in 6 mm solar flex plus 6mm earth cable.DB has 4 x 20amp fuses, fuse for each string, DP DC surge devise and 32 amp DC breaker. Looking for a coc please
I bought a house that I have to move in. I doubt wether the stability of its electrical connections as the appliances such as air conditioners and built-in radio were ripped off their mountings. There's power on the building and all other equipment like sliding gates,pool pumps,.Stove and lights in the house are working. I require information to ensure that there isn't any loose strands of open ended live wires that may electrocute or set the house alight.
Barbed wire (in rolls) to be affixed/secured to retaining structure ''wall'' in order to prevent intruders climbing retaining structure and gaining access to the property. So lengths of razor wire to be affixed to retaining structure/wall in order to prevent intruders from climbing up the structure/wall. Also required in possibly a new fence will razor wire for a small section adjacent to the retaining structure/wall.
26× wall sockets points, 13× wall switch points, 1× geyser point and bonding,1× island stove isolator point, 1× distribution board, 1× daynight switch, 1× chandelier, 2× exterior waterproof sockets, 4× sat/tv points, 6× ceiling light, 1× florescent light, 1× gate motor point, 29× down lights and 1× supply entry box
contractor that will be able to remove the existing fence and install a new Steel Palisade fence at the Tsheesebe Primary School in Waterberg District Municipality 3. STEEL PALISADE FENCE AND ACCESSORIES SPECIFICATIONS 3.1. Installation of Steel Palisade Fencing Panels: 1.8 x 3m above ground level. 3.2. Fence bearers: 40 x 40 x 2m angle iron. These are to be placed mm from top of paling and mm from bottom of paling. (mm from ground level). These are to be welded flash with the back of the post. 3.3. Palings “Devil Fork” 21 palings per panel. 30 x 30 x 2mm steel angle iron paling 1.8m high. Paling to be inserted and firmly welded to the bearers at mm centres to be centre. Top of the paling to provide a “Devil Fork” effect and bottom will have a dove tail. 3.4. Installation of 2.4m high (76 x 76 x2 mm) Posts: 76 x 76 x 2mm steel square tubing with closing pyramid caps on top. Post must be 2.4m high and mm will be planted into concrete footing to Engineer’s design. 3.5. Installation of Palisade Gates for Pedestrian and Sliding Gate 3.5.1. Sliding Gate: 5 m wide x 1.8 m high. 40 x 40 x 2 mm 4 m wide x 1.8 m high. 40 x 40 x 2 mm Post to be founded in a concrete footing x x deep. Concrete strength to be 20Mpa (minimum) at 28 days. 3.5.2. Pedestrian gate: 1.2 m wide x 1.8 m high. 40 x 40 x 2 mm 3.5.3. Painting: Clean surface and allow to dry completely. Remove all Flux, Rust, Grease and loose material before painting. All joints must be smoothed. Apply one coat Primer for steel (red oxide) and apply one coat universal undercoat and one coat Gloss Enamel (Traffic Green as specified by the LPDE) No brush painting. 3.5.4. The School has perimeter of metres N.B. the tenderer must price for Installation Labour Only, Including the concrete footing; the fence will be supplied by the fabricators.
Good morning Can you please send me a quote for 4 x 2.4M x 3 M x 20 PALES PER 3 METER /SPIKES=SPEAR 30 X 30 COLDROLL ANGLE panels 1 x 2.4M x 1 M Panels 6 x 3M x 76x76 x 1.6 POST 1 x 0.9 x76x38 Rectangular Tube 1.6 Pedestrian Gate And nut and bolt for mounted all panels mounted to the post Area will be 4M x 3M Am looking for your reply
Hello, I'd like a quotation to install an electric fence on my property. We're sub-dividing a plot in Farmall, so there is an existing perimeter fence, but we'd like to define a new boundary within that with approximately ~m of 18 strand fence connected to the existing boundary. The existing boundary fence (~m) needs a new energizer and possibly some repair. Sketch attached with existing boundary (red); new fence (green); and location of energizer (red circle). Please contact me by email. Regards,
Move an existing db board in a house To a position 6m away so a wall can be broken down So cut metal conduit in the ceiling extend the existing 2.5cm and 16mm cables by 6m Put in trunking and reroute to new position Mount new plastic db box Move all breakers earth leakage etc from old board to new board
I am looking for fencing for my yard, for a farmland. I am able to arrange pick-up from the supplier. I would also like some advice with regards to how many poles will be needed along with the fencing and with regards to anything else I might need along with the fence. I would also like to know the difference in costing between supply of fencing materials only and supply + installation.