Remove existing toilet, pedestal basin and taps, medicine cabinet, 2xtowel rails, hand towel holder, toilet paper holder and toothbrush holder. Replace above. The pedestal basin is replaced with a cabinet basin. I am out of town from December 23 through 30, so any time before or after that would be great.
When there is a rain everytime my house is flooded with rain water coming from the shower drain trap, bathroom drain trap . What is worse is the sewer and storm water drain pipes they release in the yard. It looks like there is a blockage in house pipes. Can you kindly send me a quote please see how i get affected.
Existing quadrant shower rail does not attach properly to the side brackets on the wall. The rail lifts and had in the past caused one of the sh9wer doors to fall and shatter. I installed a new shower door however the problem with the top rail persists. I wouod wondering is someone could assist to remove the old fault shower f.rame and install a new decent one for me
Existing asbestos roofing needs cleaning, some sealing and painting. Exterior walls, barge boards and facia boards need painting. Wooden doors and windows need varnishing, all window putty to be replaced. Property has two buildings i.e. main house + outbuilding. Work to be done on both structures. Boundary walls also require painting.
We have a unique water saving product which needs to interface with the hot water pipe going to the mixer of a shower. The products consists of two boxes, one housing a flow switch and a solenoid valve. Work to be done: If the hot water pipe is accessible from the top in the roof then the two pipe attachments of the flow control need to be interfaced with the pipe. If the hot water pipe is not accessible then the tiles need to be removed from the shower wall to get access to the hot water pipe and a small box housing the flow control equipment needs to be fitted to the shower wall. The cable which is used to measure flow and control the solenoid valve needs to be placed between the tiles and fitted to the electronic control which is linked to the AC supply.
Good day I am looking for quotes for plumbing services for a new house. The scope of work is as follows: - Issue plumbing COC - 2 geysers - Connect house to main sewer - Connect water from meter to house - Plumbing and toilet installation for 5 bathrooms - Plumbing to kitchen sinks - Plumbing to 2 outdoor taps Material will be supplied. Regards
Good day, we're looking for a quote on the below listed items. Thank you 1. Supply and Install angle valve for washing machine. 2. Supply and install cistern with new inlet valve and flushing mechanism, replace pan connector on mm outlet and repair leaking tap in main bathroom toilet. 3. Fitting copper strapping onto new stand pipe. 4. Remove outlet of expansion valve out of sewer vent system. 5. Supply and install grid for drain. 6. Supply and install inspection cover on toilet outlet.
1. Remove broken toilet cisterns in learner - boys (4) and learner - girls (3) toilets. 2. Replacement of cisterns (7 cisterns) with high traffic anti vandalism toilet cistern. 3. Repair broken water pipe under basin in learner (boys) toilets 4. Unblock learner - boys and girls toilets 5. Service flush valve in male staff toilet. 6. Remove old waste at urinal in male staff toilet 7. Replace with new waste (bottle trap and grating
Whatsapp or email - preferably Whatsapp communication please. To replace faulty and leaking stop cock. This is the main water supply pipe to our unit in a complex. Water supply to complex must be turned off , so that the stop cock can be replaced. I've done renovations to our flat ,and discovered a ancient, faulty stop cock. The stop cock is leaking and is on the main water supply pipe to our unit. We need to replace this faulty stop cock, and fit a new one. The problem is that we need to turn off the water supply to the complex, replace the stop cock, and return the water supply.
How much would these services cost : - Scraping down, prepping and damp proofing (per square metre) - Paint whole building - 2 coats - Repaint logo of the business - providing own accessibility to higher parts of the building ( such as ladders, scaffolding, etc) - Prime entire area and reseal with Alcoflex or equivalent - I have attached an image specifying other things that I want to be done ( leave out services that you do not do ). - The building is approximately 80sqm total size